BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Spruce Grove, Alberta. Completed plans call for site work for a water / sewer project.

The work involves the construction of a 450 mm and 350 mm diameter PVC DR25 water pipeline from the City of Spruce Grove to the Town of Stony Plain High Park Reservoir, including approximately 3,950 metres of 450 mm diameter PVC DR25 water pipeline 4,900 metres of 350 mm diameter PVC DR25 water pipeline 350 metres of 500 mm diameter HDPE DR11 water pipeline installed via horizontal directional drill 150 metres of 400 mm diameter HDPE DR11 water pipeline installed via horizontal directional drill Two trenchless crossings of Highway 628 - 750 mm diameter steel casing c/w 350 mm diameter PVC water pipeline. Two trenchless crossings of the CN Rail Campsite Road - 750 mm diameter steel casing cw 450 mm diameter PVC water pipeline. Veterans Boulevard - 750 mm diameter steel casing cw 350 mm diameter PVC water pipeline. Four trenchless road crossings Golden Spike Road - 750 mm diameter steel casing c/w 450 mm diameter PVC water pipeline. Campsite Road - 750 mm diameter steel casing c/w 450 mm diameter PVC water pipeline. Veterans Boulevard - 750 mm diameter steel casing cw 350 mm diameter PVC water pipeline. Golf Course Road - 750 mm diameter steel casing cw 350 mm diameter PVC water pipeline. Five combination air valves (CAVs) Two blow-off assemblies. Cross connection to the existing 200 mm and 400 mm CRPWSC pipelines at the WILD connection. Tie-in at Stony Plain High Park Reservoir including removal a section of existing process piping and installation of new process piping and electrical and instrumentation upgrades. Installation of a new radio tower at the High Park Reservoir Construction of the Spruce Grove Fill Building and concrete reservoir, including process piping, PLC/SCADA system, and building mechanical systems, Relocate Commissions existing radio tower located at the Commission existing fill building, and reinstall at new fill building. Connection to Spruce Grove Reservoir including tie-in to existing 600 mm stub, installation of 160 metres of 600mm PVC DR 25 water pipeline, connection to fill lines for reservoir cell 1-2 and 1-3, construction of new fill building including underground concrete water retaining structure, process piping, electrical and instrumentation, and pre-engineered building Leakage testing, swabbing, and pipeline disinfection.

Award

Water / Sewer

$20,642,578.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
26
Bidding Soon
521
All Active Projects
173
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2024

January 6, 2025

December 31, 2028

img_map_placeholder

Multiple Locations, Spruce Grove, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.