BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2023 at 7:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Brownsville, Texas. Completed plans call for site work for a water / sewer project.

Contractor should be familiar with the dredge material placement areas and the soft material found within them. Contractor should be familiar with the traffic conditions on the Brazos Island Harbor Channel. Completion Time for Schedule No. 1 for this project is estimated at 610 calendar days after receipt of the Notice to Proceed. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in an amount that will be specified in the Solicitation for each calendar day of delay until the work is completed or accepted by the Government. Bonding Requirements - The Contractor will be required to provide the Performance and Payment Bonds within Five (5) calendar days after award. The contractor shall begin work within Ten (10) calendar days after receipt of the Notice to Proceed. Subcontracting Goals for this procurement: 35.60% - Small Business; 19.0% - Small Disadvantage Business; 6.5% - Women-Owned Small Business; 3.6% - Service Disabled Veteran-Owned Small Business; 5.0% - HubZone Small Business. Estimated magnitude for this effort is estimated between $25,000,000.00 - $100,000,000.00 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$100,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
5
Bidding Soon
397
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 22, 2024

Project location map

To Be Determined, Brownsville, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.