Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Knoxville, Tennessee. Working plans call for the construction of a 163,000-square-foot educational facility; and for site work for a educational facility.
The owner has selected a Construction Manager. This project will construct a new approximately 163,000 SF chemistry building to be located at the current Panhellenic Building site. The site is next to the historic Fort Sanders neighborhood, the Taylor Law School, and a busy intersection that divides campus into North/South sections, and Northeast and Northwest sections. The building will adhere to standard campus architecture (Collegiate Gothic) but will also consider the diversity of the buildings surrounding the site, and the safety of students crossing the busy intersection. The prominent nature of the site highlights future opportunities for improving connectivity. The project will also include several utilities infrastructure needs to accommodate this new service including electrical site upgrades and the inclusion of a new chiller plant which will run in concert with the existing plant in the Law Complex. The concrete and/or steel structure will likely be between seven and nine stories, including a mechanical penthouse, depending on the State Fire Marshal's requirement for which code to design the facility under. It will house primarily laboratory, support, and other research related space. The University intends to handle the demolition of the Panhellenic Building under a separate project. This project has been approved for planning only by the State Building commission with an anticipated total project budget of $199,000,000 and a Bid Target of $165,600,000. The Bid Target amount will be used to establish the Guaranteed Maximum Price (GMP) Target. Throughout the course of the Pre-Construction Phase, the GMP Target is subject to change at the Owner's sole discretion. RFP Section 1.6, Pro Forma Master Contract (MC) Between Owner and CM/GC, and RFP Section 1.7, Scope of Services, together detail the Owners requirements for the CM/GC s scope of services. The MC substantially represents the contract document that the Proposer selected by the Owner must agree to and sign. This MC shall be effective for the period commencing on execution of this agreement and ending at the end of the one-year correction period. Proposed Contract Start Date March 4, 2024 Project Target Schedule: Preconstruction services and construction services are targeted to "overlap". The total anticipated duration for preconstruction services is 16 months beginning March 2024. Construction services schedule will be dependent upon full funding of the project. These services will be designed for early release bidding packages with construction duration (to the contractual Substantial Completion) being anticipated for 36 months beginning Spring 2025 and ending Spring 2028
Pre-Construction/Negotiated
Educational
$199,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2023
August 9, 2025
To Be Determined, Knoxville, TN
Related To This Project
Knoxville, TN
--
Knoxville, TN
Bid Date: Dec 15 2023
Knoxville, TN
Bid Date: Dec 11 2023
Knoxville, TN
Bid Date: Dec 15 2023
Knoxville, TN
Bid Date: Jan 16 2024
Knoxville, TN
--
Knoxville, TN
Bid Date: Feb 06 2024
Knoxville, TN
Bid Date: Dec 14 2023
Knoxville, TN
Bid Date: Dec 12 2023
Knoxville, TN
Bid Date: Dec 15 2023
Knoxville, TN
Bid Date: Dec 13 2023
Knoxville, TN
Bid Date: Dec 05 2023
Knoxville, TN
Bid Date: Dec 21 2023
Knoxville, TN
Bid Date: Dec 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.