Site work and new construction of an educational facility in Knoxville, Tennessee. Working plans call for the construction of a 163,000-square-foot educational facility; and for site work for a educational facility.

As of February 9, 2024, the owner has determined a prequalified list of construction managers. This project will construct a new approximately 163,000 SF chemistry building to be located at the current Panhellenic Building site. The site is next to the historic Fort Sanders neighborhood, the Taylor Law School, and a busy intersection that divides campus into North/South sections, and Northeast and Northwest sections. The building will adhere to standard campus architecture (Collegiate Gothic) but will also consider the diversity of the buildings surrounding the site, and the safety of students crossing the busy intersection. The prominent nature of the site highlights future opportunities for improving connectivity. The project will also include several utilities infrastructure needs to accommodate this new service including electrical site upgrades and the inclusion of a new chiller plant which will run in concert with the existing plant in the Law Complex. The concrete and/or steel structure will likely be between seven and nine stories, including a mechanical penthouse, depending on the State Fire Marshal's requirement for which code to design the facility under. It will house primarily laboratory, support, and other research related space. The University intends to handle the demolition of the Panhellenic Building under a separate project. This project has been approved for planning only by the State Building commission with an anticipated total project budget of $199,000,000 and a Bid Target of $165,600,000. The Bid Target amount will be used to establish the Guaranteed Maximum Price (GMP) Target. Throughout the course of the Pre-Construction Phase, the GMP Target is subject to change at the Owner's sole discretion. RFP Section 1.6, Pro Forma Master Contract (MC) Between Owner and CM/GC, and RFP Section 1.7, Scope of Services, together detail the Owners requirements for the CM/GC s scope of services. The MC substantially represents the contract document that the Proposer selected by the Owner must agree to and sign. This MC shall be effective for the period commencing on execution of this agreement and ending at the end of the one-year correction period. Proposed Contract Start Date March 4, 2024 Project Target Schedule: Preconstruction services and construction services are targeted to "overlap". The total anticipated duration for preconstruction services is 16 months beginning March 2024. Construction services schedule will be dependent upon full funding of the project. These services will be designed for early release bidding packages with construction duration (to the contractual Substantial Completion) being anticipated for 36 months beginning Spring 2025 and ending Spring 2028

Final Planning

Educational

$199,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
95
Bidding Soon
892
All Active Projects
389
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 19, 2023

August 9, 2025

May 19, 2028

img_map_placeholder

To Be Determined, Knoxville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.