BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a restaurant in Fort Riley, Kansas. Completed plans call for the renovation of a restaurant.

This project will renovate the interior of an existing Burger King and add a double drive-thru. Mechanical and electrical systems will be modified to meet Burger King's food equipment requirements. Finish will be replaced to meet Burger King's trade dress/branding standards. PN: 3212-23-000001 Question Deadline 12/14/2023 Any questions you may have after comparing the plans and specifications to the existing site conditions should be submitted in writing to GRACE PEREZ-MARTINEZ at martinezg@aafes.com The work to be performed in connection with this project includes, but is not limited to the following: 1. The project consists of all materials and labors to upgrade the existing Burger King according to the latest "Garden Grill' Burger King standards as approved by Burger King and the EXCHANGE with a limited scope. 2. BUILDING EXTERIOR AND SITE a. Modify existing exterior materials, including brick, cmu, stucco, doors, windows, and lighting, as required for new exterior design elements. b. Repair, refresh, or replace existing canopies to meet current BK image standards. c. Site work around the building, including paving and landscape: i. Replace clearance bar, directional signage, and OCU canopy with current Garden Grill image at existing drive-through. ii. Clean and refresh exterior digital menu boards at existing drivethrough. iii. Add dual drive-through lane and install required clearance bar, signage, OCU canopy, and digital menu board. iv. Trash enclosure painted to match new building materials and finishes. v. Seal and stripe parking lot. vi. Paint bollards. d. Construct/modify existing 'tower' and install Nichiha finish. e. Replace existing drive through windows. f. Paint to match current specifications. g. Renovate existing Aluminum windows and storefront system as required. h. Upgrade exterior lighting to LED fixtures. i. Replace Building Signage with new current standard signage. j. Replace Door hardware if it does not comply with current BK standards BUILDING INTERIOR: a. Replace all light fixtures, including emergency lighting and exit signage. b. Replace all finishes in the dining room. c. Kitchen equipment is existing and is to remain except as noted to be replaced on the equipment plan. d. Provide power and cable connections for flat screen tv in Dining room. e. Replace all furniture (Seating Concepts design). f. Repair and repaint soffit with recessed lights above the front service counter. g. Renovate existing toilet rooms, including new plumbing fixtures. Use existing plumbing supply and sanitary lines, vents, etc. as possible. h. Bring any non-ADA compliant toilets into compliance. i. Existing vent hoods and exhaust fans are be replaced. Paint as required. j. Upgrade existing fire sprinkler system if required. (Fire Protection Engineering services not included in base scope and fee) k. Upgrade existing fire alarm system if required. (Fire Protection Engineering services not included in base scope and fee) l. Existing Ansul system to remain. m. Existing grease interceptor to remain. n. Existing electrical panels and equipment to be reused. o. Replace or re-laminate interior doors. p. Ceiling treatment Per Seating Concepts design

Post-Bid

Restaurant

$2,500,000.00

Public - Federal

Renovation

59

23

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
191
All Active Projects
81
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 27, 2023

February 19, 2024

img_map_placeholder

Building 6922, Fort Riley, KS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.