BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a sidewalk / parking lot in Crystal River, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The last day for questions is 3:00 PM E.T on December 21, 2023. DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor for the Work, which generally involves the following activities: For the Crystal River Parking Project, work involves the construction of new parking spaces along NW 1st Ave and the improvement of the unpaved parking lot at US19 and NW 1st Ave to a paved parking lot. Installation of a Riverwalk trail, landscaping, dumpster pad, FDOT Driveway connection, Relocation of power poles, relocation and addition of signage, removal of fences, and other improvements. CONTRACT TIME: Construction time to achieve Substantial Completion is 180 consecutive calendar days from the date of the Notice to Proceed, with an additional 45 consecutive calendar days to achieve Final Completion. BID SECURITY: A 5% bid security will be required for this project. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. The City of Crystal River reserves the right to waive formalities, waive any technical defects, reject any and all bids, and accept any bid which represents the lowest and best offer to the City.

Bid Results

Sidewalks / Parking Lot

$812,394.00

Public - City

Paving, Site Work

17

10

10

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
56
Bidding Soon
846
All Active Projects
354
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

February 16, 2024

img_map_placeholder

Multiple Locations, Crystal River, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.