Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Olympia, Washington. Completed plans call for the construction of a 15,774-square-foot, one-story above grade pre-engineered storage facility; for site work for a pre-engineered storage facility; for the demolition of a 2,500-square-foot pre-engineered storage facility; road / highway; and for paving for a road / highway.
Site Directions: 9701 Blomberg St. SW. Olympia, WA. 98512. From 1-5: Take exit 99 toward WA-121 S/93rd Ave. Go for 0.4 mi.; Turn left onto 93rd Ave SW (WA-121). Go for 0.3 mi: Take the 1st exit from roundabout onto 93rd Ave SW. Go for 0.4 mi; Turn left onto Blomberg St SW. Go for 0.1 mi.: 9701 Blomberg St. SW is on your right. Drive through gate and turn right and park at office building at end of driveway. Bidders will be charged a fee of $42.00 to submit a bid electronically. The Proposed Project Consists of a New One (1) Story Shop / Office Building for the Washington State Department of Natural Resources in Olympia WA. This Facility Will Include a Break Room, Extraction Room, Processing Room, Freezer Room, (2) Restrooms, Mechanical and I.T. Rooms. Includes (7) Parking Spaces The project consists of the construction of a new one-story seed center building for the Washington State Department of Natural Resources (Owner) located at 9701 Blomberg St. SW. Olympia, WA. 98512, as described in the construction documents prepared by DNR, together with their consultants. The facility includes a (2) processing rooms, an extractor room, freezer room, interior compressor room, exterior compressor space, dust collector space, fire sprinkler riser room, mechanical room, I.T. room, break room, and restrooms. The Work includes construction of a new Pre-Engineered Metal Building (Type II-A) Single Story 15,774 square feet seed center building. Construction is standard metal framing with concrete slab on grade and standard foundations, together with HVAC, plumbing, and electrical systems. Site work includes installation of an infiltration trench, and piping, utilities, and new concrete paving. The removal of an existing 2,500 square feet single story wood frame storage building will take place prior to make room for the construction of the new building. Vehicle access will remain from existing access points. Onsite sewer, water, electricity, gas, and phone services are available. The estimated cost of the project is $5,061,000, and the required substantial completion date is January 31, 2025. The project is located at 9701 Blomberg St. SW. Olympia, WA. 98512 Within existing resources, awarding agencies are responsible for monitoring apprenticeship utilization hours by contractor. There must be a specific line item in the contract specifying that apprenticeship utilization goals should be met, monetary incentives for meeting the goals, monetary penalties for not meeting the goals, and an expected cost value to be included in the bid associated with meeting the goals. The awarding agency must report the apprenticeship utilization by contractor and subcontractor to the supervisor of apprenticeship at the department of labor and industries by final project acceptance. The electronic reporting system that is being developed by the department of labor and industries may be used for either or both monitoring and reporting apprenticeship utilization hours.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$4,650,549.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 22, 2023
February 28, 2024
9701 Blomberg St SW, Olympia, WA
Related To This Project
Olympia, WA
--
Olympia, WA
Bid Date: Dec 21 2023
Olympia, WA
--
Olympia, WA
--
Olympia, WA
Bid Date: Jan 25 2024
Olympia, WA
Bid Date: Jan 25 2024
Olympia, WA
Bid Date: Mar 05 2024
Olympia, WA
Bid Date: Dec 11 2023
Olympia, WA
--
Olympia, WA
--
Olympia, WA
Bid Date: Dec 07 2023
Olympia, WA
--
Olympia, WA
--
Olympia, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.