BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fountain Valley, California. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work shall consist of furnishing all labor, materials, tools, equipment, appurtenances, and incidentals for the modification of the traffic signals, traffic signal equipment, signal poles and foundations, conduits, pedestrian push buttons, LED countdown pedestrian heads, controller unit, battery back-up systems, equipment removals and replacement, equipment relocations, striping, disposal of existing concrete, removal and disposal of PCC curb, gutter and sidewalk, construction of concrete curb, gutter, sidewalk, curb ramps, and related work shown in accordance. Project Type Bid Response Types Line Items, Subcontractor ,Bid Bond ,Proposal Docs Type of Award, Lump Sum Contractor License Certification(s) required for this project: A General, C10 Electrical. Question Deadline 12/04/2023 at 4:00 PM PT Liquidated Damages - The work shall be diligently prosecuted to completion before the execution of the Working Days allowed for this project. The Contractor shall pay to the City the sum of $400.00 per day for each and every calendar days delay in finishing the work after expiration of the number of working days of the contract. Bidders shall submit Bid Security at bid time. Bid security shall be in one of the following forms: issuance of an electronic Bid Bond verified through Surety2000, or a cashier's check, a properly certified check upon some responsible bank, payable to the City of Fountain Valley for an amount of not less than ten percent (10%) of the total bid amount. The City is looking to streamline the bid process and prefers to receive an electronic Bid Bond through website. All proposals examined and declared will be referred to the City Engineer and the City Attorney for examination and presentation to the City Council at their regular meeting in January, 2024. the work to completion before the expiration of Forty (40) Working Days. The Contractor shall be required to provide written verification from vendor(s) stating the tentative dates of delivery of all pertinent items necessary to complete work in accordance with this Contract. The City reserves the right to reject any and all bids. The City reserves the right to reject any and all bids.

Bid Results

Roads / Highways

$117,800.00

Public - City

Paving, Site Work

5

8

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
139
Bidding Soon
2,385
All Active Projects
1,097
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

January 11, 2024

img_map_placeholder

Multiple Locations, Fountain Valley, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.