BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a residential development in Jackson, Michigan. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Reference Number 0000336122 City of Jackson hereby invites businesses who meet the qualifications and specifications set forth herein to submit Quotes for asbestos abatement, demolition of residential buildings and accessory structures, and site restoration at various locations throughout the City of Jackson. Questions are submitted online No, Questions about this invitation to quote should be directed to Shelly Allard, Purchasing Coordinator, (517)768.6401, sallard@cityofjackson.org. *The City reserves the right to reject any and all bids and to waive minor irregularities and/or technicalities in the bids. 1) Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment. 2) Compact all clean backfill material with a hoe-pack or vibrating roller compactor. 3) Remove _ _0_ curb(s) cut(s) and entry approach(s). (0 lineal feet)*** Alley to W** 4) Install _ __0_ lineal feet of curb and gutter. Note if clean edge cannot be provided upon removal of curb, road will need to be overcut 18-24" to allow for forming of curb and then road hot patched upon completion due to conditions of road. 5) Remove and replace _ 36 lineal feet _of cracked, heaved and broken public sidewalks. (raise grade through walk to allow to cover tree roots and provide positive slope to ROW area) 6) See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor's responsibility to insure that neighboring water and sewer services are operational at the conclusion of the demolition. 7) Trees/shrubs: Remove hedge row to W, 2 pine trees to N, all brush and saplings along S fence lines and any brush from site. Plant 8 arborvitae trees evenly spaced along W alley and 2- 2 1/2 " caliper maple trees in yard area and 1- 2 1/2 " caliper Cleveland Pear Tree in ROW area 8) Miscellaneous: Regrade full property area and ROW to finish conditions. Provide clean edge along W gravel alley and repair any damage to alley incurred during demolition

Post-Bid

Residential Subdivision

$100,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
82
Bidding Soon
1,511
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

January 3, 2024

img_map_placeholder

Multiple Locations, Jackson, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.