BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The Scope of Work of the Contract shall include all materials, labor, equipment, supervision and incidentals for the construction of Paving, water distribution system, wastewater collection system, storm water collection system, and related improvements of Solid Rock Village, Sec. 2 located in the City of Houston. Each Bid must be accompanied by a bid bond or a certified or cashier's check, mailed or delivered to 4615 North Freeway, Suite 212, Houston, TX 77022, reception desk, in an amount not less than 2 percent (2%) of the total amount bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. Question Deadline is 12/06/2023 at 5PM. Answers will be uploaded into an Addendum. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. Contractors are to submit their Turnkey proposal price as well as # of consecutive calendar days they propose to complete the work within. The Successful Bidder, if any, will be the responsible Bidder which, in the Owner's judgment, will be most advantageous and result in the best and most economical completion of the Project. Furthermore, the successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. Contract documents will be prepared according to time proposed within the RFP and liquidated damages will occur in the amount of $500 per day that work exceeds the time proposed. No bid may be withdrawn until the expiration of 90 days from the date bids are opened.

Bid Results

Roads / Highways

$2,519,005.00

Public - City

Paving, Site Work

47

17

6

5

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
61
Bidding Soon
2,753
All Active Projects
1,064
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.