BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Awendaw, South Carolina. Completed plans call for site work for a water / sewer project.

Project Description The proposed work consists of removal of the existing 23' X 53" concrete boat ramp and installation of a new, 28' X 72" two-lane concrete boat ramp and the installation of an 8' X 100' floating, ground out queuing dock. The proposed new floating dock will assist with on-loading and off-loading for users of the boat ramp. This portion of the river is not the main navigation channel, and the new dock will not restrict access to any dock or navigable waterway. Avoidance and Minimization The applicant has stated that the proposed project will minimize impacts to the aquatic environment extending the footprint of the existing boat ramp. The applicant has stated that best management practices will be used in the installation of the new docks. Proposed Compensatory Mitigation The applicant has stated that due to the limited impacts to aquatic resources, mitigation is not proposed. No tidal wetlands will be impacted with the proposed boat ramp replacement and dock installation. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. The benefit which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary to the public interest. In cases of conflicting property rights, the Corps cannot undertake to adjudicate rival claims. According to the applicant, the purpose of the proposed project is to replace the existing Paradise Island boat ramp with a larger boat ramp for public access

Post-Bid

Water / Sewer

$400,000.00

Public - Federal

Site Work

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
48
Bidding Soon
498
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

January 12, 2024

img_map_placeholder

Chandler Rd, Awendaw, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.