BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a transportation facility in Saint Cloud, Minnesota. Completed plans call for the renovation of a transportation facility.

Phase 1 Rework: Site Work: Remove, salvage, and reset nominal/minimal existing brick to correct excessive area of slope in accessible pathway from ADA parking area. New ADA compliant concrete paving, striping, and ADA symbols for (3) ADA parking spaces. Station Interior: Replace rear grab bar at men's room Replace women's room lavatory faucet with metering faucet to meet req's of DOTAS. Replace hi low drinking fountain in waiting room. New door closer at parking side door. New door closer at platform side door. Phase 2 Rework: Site Work: Remove approx. 800 ft of existing asphalt platform and paving. Remove 1 existing concrete railway crossing. Remove existing asphalt for pathway from station building to platform. Salvage existing WCLE, save and store for relocation on new slab with direct access to new platform. Remove all materials per BNSF specifications and applicable regulations. New site grading, drainage, and utilities to support new platform. Modify existing sidewalk from station building to prow to accommodate new conditions. (2) New 12' clear concrete platform sections, 8" ATR, 245' in length, including detectable warning strips and guardrail. (1) New 12' clear concrete landing, 0" ATR, 137' in length, between new platform sections with compliant access to raised platform, and 2 new rail crossings. Including detectable warning strips. Signage: Relocate (3) existing A1 signs and foundations. Relocate (1) existing A12 sign and foundation. Relocate (2) existing R7-8 HC parking signs and foundations. Relocate (1) existing R7-8P van accessible parking sign and foundation. (1) New C20 exterior sign at track side station entrance. (2) New D4 regulatory signs at ends of platform, restricted to public access. (2) New D4a regulatory signs at ends of platform, emergency exit only. Station Exterior: Replace doors and all accessories on the track side and parking side for ADA compliancy, make door operation ADA compliant. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to March 2024. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$5,000,000.00

Public - Federal

Paving, Renovation, Site Work

62

23

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
43
Bidding Soon
734
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2024

March 12, 2024

img_map_placeholder

555 E St Germain St, Saint Cloud, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.