BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and addition to a mixed-use development in Gulf Shores, Alabama. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; for the construction of a clubhouse / community center; for the addition of a hospitality development; for the demolition of a hospitality development; hospitality development; and clubhouse / community center.

The Alabama Department of Environmental Management (ADEM) hereby gives notice that Fort Morgan Marina and Motor Coach Resort has applied for a Coastal Area Management Program Permit in accordance with ADEM Administrative Code Division 335-8. Fort Morgan Marina and Motor Coach Resort proposes to develop the "Fort Morgan Marina and Motor Coach Resort" on an approximately 8.56-acre parcel located at the westernmost end of the Fort Morgan peninsula. This development will encompass two parcels and includes the existing 30-slip Fort Morgan Marina, a boat dry storage building, Tacky Jack's 2 restaurant, a small hotel/condominium, boat launch, and associated parking and accessory uses. The new project will introduce a 34-lot, gated motor coach resort designated for Class A recreational vehicles, coupled with new amenities such as a 78-space parking lot, an expanded restaurant with outdoor decks, an outdoor pool, clubhouse, and walking trails. The westerly parcel is currently undeveloped, hosting mature oak and pine trees along its perimeter. The site, situated north of Fort Morgan Road and west of South Breakers Lane, is partially open and previously developed. Notably, the entire parcel and the project area contain 0.4 acres of wetlands, which will not be impacted. The proposed facility is located at 577 Hwy 180 in Gulf Shores, Baldwin County, Alabama. Any person wishing to make comments or provide additional information relative to the proposed activity's consistency with the ACAMP must submit such comments or information by letter or by email to ADEM at the address below within fifteen (15) calendar days following the publication date of this notice. The Department's determination, associated documents and all comments received during the public comment period will be available for inspection at the ADEM office located at the above address during normal working hours. The Department does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in the administration of its programs.

Final Planning

Clubhouse / Community Centers

$26,000,000.00

Public - State/Provincial

Addition, Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
29
Bidding Soon
461
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.