BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Aurora, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of April 23, 2024, per owner, this project is still under review. The City of Aurora, Illinois (City) needs professional services from a qualified engineering consultant for Phase I Design Engineering Services for the E New York Street & N Farnsworth Avenue Intersection Improvement project. The City will have the option to utilize the same consultant for Phase II Design Engineering that completed the Phase I Study. As a part of the selection process, the interested consultants are required to a Statement of Qualifications (SOQ) to perform the requested work. Pre-bid Meeting: N/A All questions must be received by 4:00 PM (CST) on Friday December 15, 2023. A response to all questions received will be posted on the City's website by 4:00 PM (CST) on Tuesday December 19, 2023. It is the responsibility of the consultant to ensure they have any pertinent documents from the City's website including addendums. Any SOQ received after the above noted deadline may not be used as part of the consultant selection process. The email should include the City's bid number (QBS 23-115). The City of Aurora reserves the right at any time and for any reason to cancel this consultant procurement process, to reject any or all SOQ's, or to accept an alternative SOQ. The City of Aurora reserves the right to discard any immaterial SOQ. The City and/or staff may seek clarification from a submittal at any time and respond promptly if there is cause for rejection. The City of Aurora will not be liable in any way for any costs incurred by consultants in replying to this request. The project has secured HSIP federal grant funds in the amount of $676,060. However, Motor Fuel Tax (MFT) funds will be utilized for completing Phase I engineering and no federal funds will be utilized in Phase I. Phase I engineering must follow the IDOT standards and process to be eligible to use federal funds for future phases. The estimated construction cost for the above said improvement is $1,735,000. Awarded HSIP funds does not cover the total cost of the project. City will potentially use either HSIP funds or other federal funds that City plans to apply for, in the future during or after Phase I Engineering is complete for other phases of the project (Phase II, CE and Construction). HSIP funds must be federally authorized by November State letting in 2026, or funds will be rescinded. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$1,735,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
90
Bidding Soon
1,756
All Active Projects
764
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

img_map_placeholder

N Farnsworth Ave & E New York St, Aurora, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.