BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of a municipal facility in Pontiac, Michigan. Completed plans call for the renovation of a municipal facility; for asbestos abatement for a municipal facility; and for site work for a municipal facility.

Asbestos Abatement @ Whitmer Human Resource Center 2024 Door and Window Renovations Reference Number 0000336216 Delivery Point WHRC Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required Award Requirements - All or None Award Questions Regarding Project Specifications: All questions regarding the Project Specifications should be addressed to: Roosevelt Austin III, Arch Environmental Group, Inc. Office: (248) 426-0165 Mobile: Roosevelt Austin III Email: rosey@archenvgroup.com o Project Group WHRC-1 - "Area B Window and Door Abatement" The first project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area B at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows, exterior window and door system materials using Class II removal procedures. The project will begin on Thursday, June 20, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Monday, June 24, 2024. The projectschedule allowsfor a total of four(4) work days(ThursdaySaturday, Monday) to complete the project. o Project Group WHRC-2 - "Area C Window and Door Abatement" The second project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area C at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows, exterior window and door system materials using Class II removal procedures. The project will begin on Tuesday, June 25, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Saturday, June 29, 2024. The project schedule allows for a total of five (5) work days (TuesdaySaturday) to complete the project. o Project Group WHRC-3 - "Area D Window and Door Abatement" The third project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area D at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Monday, July 1, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Saturday, July 6, 2024. The project schedule allows for a total of five (5) work days (Monday-Wednesday, Friday-Saturday, Monday) to complete the project. o Project Group WHRC-4 - "Area E Window and Door Abatement" The fourth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area E at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Monday, July 8, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Thursday, July 11, 2024. The project schedule allows for a total of four (4) work days (Monday-Thursday) to complete the project. o Project Group WHRC-5 - "Area F Door Abatement" The fifth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area F at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior door system materials using Class II removal procedures. The project will begin on Friday, July 12, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Friday, July 12, 2024. The project schedule allows for a total of one (1) work days (Friday) to complete the project. o Project Group WHRC-6 - "Area G Window and Door Abatement" The sixth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area G at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Saturday, July 13, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Thursday, July 18, 2024. The project schedule allows for a total of five (5) work days (Saturday, Monday-Thursday) to complete the project. o Project Group WHRC-7 - "Area H Window and Door Abatement" The seventh project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area H at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Friday, July 19, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Wednesday, July 24, 2024. The project schedule allows for a total of five (5) work days (Friday-Saturday, Monday-Wednesday) to complete the project. o Project Group WHRC-8 - "Area J Window and Door Abatement" The eight project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area J at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Thursday, July 25, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Wednesday, July 31, 2024. The project schedule allows for a total of six (6) work days (Thursday-Saturday, Monday-Wednesday) to complete the project. o Project Group WHRC-9 - "Area K Door Abatement" The ninth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area K at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior door system materials using Class II removal procedures. The project will begin on Thursday, August 1, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Thursday, August 1, 2024. The project schedule allows for a total of one (1) work days (Thursday) to complete the project. o Project Group WHRC-10 - "Area A Window and Door Abatement" The tenth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area A at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Friday, August 2, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Monday, August 5, 2024. The project schedule allows for a total of three (3) work days (Friday-Saturday, Monday) to complete the project. o Project Group WHRC-11 - "Area B Window and Door Abatement" The eleventh project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and door system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area B at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Tuesday, August 6, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Wednesday, August 7, 2024. The project schedule allows for a total of two (2) work days (Tuesday-Wednesday) to complete the project. o Project Group WHRC-12 - "Area D Window Abatement" The twelfth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing and all drywall with asbestos mud impacted by the removal of exterior window system materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area D at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing and drywall with asbestos mud impacted by removal of exterior window system materials using Class II removal procedures. The project will begin on Thursday, August 8, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Friday, August 9, 2024. The project schedule allows for a total of two (2) work days (Thursday-Friday) to complete the project. o Project Group WHRC-13 - "Area E Window and Door Abatement" The thirteenth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and doorsystem materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area E at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and door system materials using Class II removal procedures. The project will begin on Saturday, August 10, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Tuesday, August 13, 2024. The project schedule allows for a total of three (3) work days (Saturday, Monday-Tuesday) to complete the project. o Project Group WHRC-14 - "Area F Window and Door Abatement" The fourteenth project for abatement at Whitmer Human Resource Center includes the removal and disposal of all exterior window systems with asbestos caulk and glazing, all exterior window and door systems with asbestos caulk and glazing, all exterior door systems with asbestos caulk, and all drywall with asbestos mud impacted by the removal of exterior windows and exterior window and doorsystem materials from throughout designated locations at Whitmer Human Resource Center. This project will include, but is not limited to, Area F at Whitmer Human Resource Center. This project group at Whitmer Human Resource Center will involve multiple regulated areas to remove exterior window systems with asbestos caulk and glazing, exterior window and door systems with asbestos caulk and glazing, exterior door systems with asbestos caulk, and drywall with asbestos mud impacted by removal of exterior windows and exterior window and doorsystem materials using ClassII removal procedures. The project will begin on Wednesday, August 14, 2024, and will be complete with all abatement activities, including tear down activities, by the end of the work day on Saturday, August 17, 2024. The project schedule allows for a total of four (4) work days (Wednesday-Saturday) to complete the project.

Bid Results

Municipal

$209,780.00

Public - City

Asbestos Abatement, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
103
Bidding Soon
1,432
All Active Projects
611
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

June 20, 2024

img_map_placeholder

60 Parkhurst St, Pontiac, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.