Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 1, 2023 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Steelville, Missouri. Contact the soliciting agency for additional information.
Crawford County Road Districts 1 and 2 are requesting bids for the following items to be supplied for a period beginning January 1, 2024, and ending December 31, 2024: o Annular Riveted Corrugated Metal Pipe o Bulk Motor Oil and accompanying storage tanks o DEF fluids by case or drum o Limestone Rock; All Minus Rock; All Clean Rock; AG Lime; Shot Rock; Screenings and Graded Rip Rap o Ready-Mix Concrete in standard five-bag mix, six-bag mix, plus each mix with fiber added o 3/8" Minus Commercial Grade Hot Mix and Cold Mix Asphalt for patching black top roads (Hot Mix and Cold Mix Asphalt must meet MoDOT Requirements and made inside a plant, not outside on a road.) o Screened Creek Rock Crawford County Commission reserves the right to accept/reject any/all bids, or to accept more than one bid, depending on the needs of each Road District, and the proximity of the plant to the work site.
Post-Bid
Roads / Highways
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2023
January 11, 2024
Multiple Locations, Steelville, MO
Related To This Project
Steelville, MO
Bid Date: Mar 18 2024
Steelville, MO
Bid Date: Mar 27 2024
Steelville, MO
Bid Date: Jun 28 2024
Steelville, MO
Bid Date: Jul 31 2024
Steelville, MO
Bid Date: Aug 19 2024
Steelville, MO
Bid Date: Aug 15 2024
Steelville, MO
Bid Date: Aug 26 2024
Steelville, MO
Bid Date: Sep 10 2024
Steelville, MO
Bid Date: Nov 06 2023
Steelville, MO
Bid Date: Dec 21 2021
Steelville, MO
Bid Date: Aug 15 2023
Steelville, MO
Bid Date: Jul 07 2023
Steelville, MO
Bid Date: May 22 2023
Steelville, MO
Bid Date: May 17 2023
Steelville, MO
Bid Date: Feb 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
