BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a civil project in Katy, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The work consists of providing the necessary labor, materials, equipment, and supervision to construct Wastewater Treatment Plant Expansion to 0.3 MGD for Willow Point Municipal Utility District. Estimate: $3,600,000 The site work contractor is responsible for all site work, including but not limited to expansion of the capacity of the existing lift station including bypass pumping, demolition and replacement of three (3) submersible pumps with all accessories, riser piping, valves, and coatings; cement mortar repair and coating of the interior of the lift station wet well; yard piping; potable water meter, piping and connection; relocation of an existing 8" sanitary sewer line and manholes; site work; demolition of existing fencing; installation of new wood fencing; site work; crushed concrete roads and IWTP pad; protective coatings, concrete pads; site grading; new utility electrical service; service entrance equipment; diesel generator and automatic transfer switch; 480V distribution panelboard; 120/240V panelboard; transformer; lighting contactor panel; autodialer; SPD; site lighting; electrical rack and supports; underground duct banks; wires and conduits from the terminal boxes at Aeration Basin No. 1 to the electrical rack; installation of the PLC panel at the rack; modification to lift station control panel; grounding; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The deadline to ask questions is 12/18/2023 10:00 AM CST The lease of the 150,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifier; chlorine contact basin; non-potable water system; chlorine gas disinfection equipment, chlorine induction pump, and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lightings, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Aeration Basin No. 1); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub up for the force main piping upstream of the manual bar screen and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 18-inches (18") above finished grade at all locations. The site work contractor shall perform all electrical work including connection from a new electrical service to the service rack including all aboveground conduit and wire to pads. The plant lease contractor is responsible for all electrical work downstream of the local control panels, including the control panels. The site work contractor is responsible for all underground duct bank work and all other electrical work from the main service rack to the local control panels for the leased equipment. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules. Each bid must be accompanied by a five percent (5%) bid bond of the maximum total bid amount. Make the bid bonds payable to the Owner. Bidder must be capable of executing a satisfactory performance bond and payment bond for 100 percent (100%) of the contract sum in accord with the conditions of the contract. The Owner reserves the right to reject any or all bids, waive any or all irregularities, and accept the bid which is deemed most advantageous. No bid may be withdrawn until the expiration of 90 days from the date bids were opened. The Owner is not obligated to accept the lowest bid or any bid. The Owner reserves the right to reject any or all bids and to waive any informalities in bids or in bidding. The Owner may accept any bid deemed advantageous. The contract award may include full consideration of unit prices and time of completion.

Post-Bid

Water / Sewer

$3,600,000.00

Public - County

Addition, Demolition, Site Work

55

24

4

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
222
Bidding Soon
4,226
All Active Projects
1,706
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.