BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Houghton Lake, Michigan. Completed plans call for the renovation of a educational facility.

**As of January 26, 2024, No Award, Award should be available around February 12, 2024** replace the existing cafeteria furniture and kitchen equipment items at Houghton Lake High School replace the existing cafeteria furniture and kitchen equipment items at Houghton Lake High School on behalf of Houghton Lake Community Schools The School District reserves the right to reject any or all proposals as it deems to be in the best interest of the School District discussed and selected at the board meeting on January 8th. They will officially award this project by January 9th. The expectation is to have the kitchen equipment portion completed before the furniture based on shorter lead times. Specific installation dates will be provided to the school after orders are released Direct any request for additional information contact at email. Any information that the school district deems appropriate to provide in response to the Proposer's request for additional information will be shared with all proposers. Deadline for clarification requests is December 15, 2023, via email to: Lacie Curns (Food Service Director), laciecurns@gmail.com The school corporation reserves the right to request any additional information that might be deemed necessary after opening the responses. The School District reserves the right to reject any or all proposals and to waive informalities and minor irregularities in proposals received and to accept any portion of a proposal or all items proposed if deemed in the best interest of the School District. The competency, responsibility, experience, and reputation of the bidders will be considered in making the award. Bidders shall bid on the specifications and any exceptions must be noted. Owner/School to take care of any electrical/plumbing upgrades to accommodate new equipment including modification to the existing hood and gas lines in the kitchen to accommodate the new combi oven. 2. Owner/School is responsible for disposing of or moving any existing cafeteria furniture to make room for new items 3. Any work not included within specs that is required/needed, dealer must bring this to the attention of owner at time of RFP. 4. Dealer to perform the following work: 1. Confirm all utilities prior to release of equipment to factory 2. Sign off on all required shop drawings confirming direction, voltage, sizes, and any other necessary items to release. 3. Provide signed off on shop drawing to owner for records 5. Coordinate with different trades/installer on timing of equipment delivery and with owner. 6. Provide owner operating manuals in digital form and any operational training videos by manufacturer. 7. Coordinate factory-rep training with owner's staff at completion of project.

Award

Educational

$151,846.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
10
Bidding Soon
228
All Active Projects
85
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

January 22, 2024

img_map_placeholder

4433 W Houghton Lake Dr, Houghton Lake, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.