BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Grafton, Ohio. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of May 29, 2024, construction is complete. General contractor information has not been determined. The Memorial was dedicated on Memorial Day. *The closed solicitation has been included below for reference: The Village of Grafton is accepting proposals to construct a 7500 sq. foot Veterans Memorial Park at the intersection of Willow and Main Streets. The project involves site preparation per architectural plans and design, installation of sidewalks and specified stamped concrete surfaces per architectural design and specifications, site grade including specified mounding and landscaping per architectural design. Site irrigation installed per plans. Site electric conduit installed per plans. Site flagpole foundations installed per plans, and site monument/pedestals foundations installed as specified in location and structure, and other items as specified in plans within the project scope of design. Project award date TBD, January 2024. Construction start date in March 2024 with added consideration given for adverse weather conditions delaying a March 2024 start date. The completion date is to not exceed Friday May 17, 2024, to meet park dedication date MEMORIAL DAY, May 27, 2024. Proposals must include an itemized line by line total cost to construct each element of the project, such as but not limited to Sidewalks cost per sq. ft, Stamped Concrete surfaces cost per sq. ft., Irrigation cost, Foundation cost for each specified flagpole, Foundation/Pedestal cost for each Monument specified, cost to meet final grade, restore topsoil, seed, and straw site to meet specified restoration of the memorial. Questions on the project can be directed to Village Administrator Joe Price at jbprice@villlageofgrafton.org until December 20, 2023. The method of Contractor Selection has not been Determined at this time.

Occupancy

Playgrounds / Parks / Athletic Fields

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
142
Bidding Soon
2,593
All Active Projects
1,090
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 1, 2024

May 17, 2024

img_map_placeholder

35938 OH-303, Grafton, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.