BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Magnolia, Texas. Completed plans call for the renovation of a water / sewer project.

The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 60 calendar days from the date bids are open. The work consists of providing the necessary labor, materials, equipment and supervision, and plan to purchase, factory test, store, and deliver the Water Plant Generator and Automatic Transfer Switch to the Two Step Water Plant No. 1 and the Wastewater Treatment Plant Generator and Automatic Transfer Switch to the Two Step Water Wastewater Treatment Plant including but not limited to, bonds and insurance; 600-kW diesel engine driven generator with sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank; 500-kW diesel engine driven generator with sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank; two automatic transfer switches; factory testing, and all else detailed in the specifications. The deadline to ask questions is 12/12/2023 11:00 AM CST In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Questions will not be considered or answered after 11:00 a.m., three (3) calendar days prior to bidding. b. Necessary replies will be issued to bidders of record as addenda, which becomes a part of the bidding instruments. Oral instructions do not form a part of the bidding instruments. c. Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding the Work. The work consists of providing the necessary labor, materials, equipment and supervision, and plan to purchase, factory test, store, and deliver the Water Plant Generator and Automatic Transfer Switch to the Two Step Water Plant No. 1 and the Wastewater Treatment Plant Generator and Automatic Transfer Switch to the Two Step Water Wastewater Treatment Plant including but not limited to, bonds and insurance; 600-kW diesel engine driven generator with sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank; 500-kW diesel engine driven generator with sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank; two automatic transfer switches; factory testing, and all else detailed in the sp Question Deadline 12/12/2023 at 11:00 AM CT

Award

Water / Sewer

$426,869.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
79
Bidding Soon
2,731
All Active Projects
968
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2023

January 15, 2024

img_map_placeholder

FM 1488 & Honea Egypt Rd, Magnolia, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.