Site work and paving for a civil project in Ashley, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The project consists of the reconstruction of Campbell Road between Vandemark Road and Kuther Road, including curbs, drainage inlets, and roadway. State of Ohio Prevailing Wage Rates apply. Any and all questions regarding the referenced project must be submitted through the Bid Express website no later than 1 :00 p.m. (EST) on Monday, January 8, 2024. Questions submitted outside of Bid Express will not be answered. All proposals shall be accompanied by a bond in the sum of at least ten percent (10%) of the Bid to the satisfaction of the City Manager or by a certified check made payable to the City of Sidney in the sum of at least ten percent (10%) of the Bid on a solvent bank, as a guarantee that if the Bid is accepted, a Contract will be entered into and its performance properly secured within seven (7) working days after written notification of acceptance has been given. The City reserves the right to reject any or all bids and to award the Contract to the lowest and best bidder. The City reserves the right to waive any informality or irregularity discovered in any Bid, which in the City's judgment best serves their interest. The City reserves the right to award any, all, or a combination of Bid items, if applicable. The Owner reserves the right before any award of the Contract is made to require of any Bidder to whom it may make an award of the principal contract, a non-collusion affidavit. Substantial completion of the project shall be on or before September 27, 2024. Final completion of the project and readiness for final payment shall be on or before October 11, 2024. Substantial Completion: Two Hundred Fifty Dollars and No Cents ($250.00) per day beyond the substantial completion date. Final Completion: Five Hundred Dollars and No Cents ($500.00) per day beyond the final completion date.
Award
Roads / Highways
$2,518,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2024
March 11, 2024
Campbell Road, Ashley, OH
Related To This Project
Ashley, OH
--
Ashley, OH
Bid Date: Jan 25 2024
Ashley, OH
--
Ashley, OH
Bid Date: Feb 05 2024
Ashley, OH
Bid Date: Mar 20 2024
Ashley, OH
Bid Date: Dec 04 2023
Ashley, OH
Bid Date: Dec 14 2023
Ashley, OH
Bid Date: Oct 12 2023
Ashley, OH
Bid Date: Mar 06 2019
Ashley, OH
Bid Date: May 04 2020
Ashley, OH
Bid Date: Apr 04 2022
Ashley, OH
Bid Date: Sep 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.