BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bolivia, North Carolina. Working plans call for site work for a water / sewer project.

Brunswick County is inviting qualified Design-Builders to submit qualifications statements for the design and construction of essential water infrastructure enhancements in the Town of St. James area of Brunswick County. The project's objective is to alleviate reduced pressure concerns in the Town of St. James and surrounding areas during peak demand periods County finalized a Preliminary Engineering Report (PER) that provides recommendations for addressing the project's objective of alleviating reduced pressure concerns in the Town of St. James and surrounding areas during peak demand periods. This project shall follow the recommendations in the PER, as the basis for this project. The recommendations include the design and construction of the following: *St. James 211 Gap Water Line - Approximately 5,920 LF of 16-inch water main, beginning 6,800 feet east E.F. Middleton Boulevard and running t*the east t*a point approximately 600 feet west of St. James Drive. *16-inch Check Valve - Check valve vault, by-pass line and associated piping and valves. Insert int*the existing 16-inch water line on E.F. Middleton Boulevard at its intersection with Highway 211. *E.F. Middleton Boulevard Transmission Main Extension - Approximately 4,850 LF of 16- inch water line southward along E.F. Middleton Boulevard from Seafield Drive. Then, approximately 1900 LF of 12-inch (nominal I.D. via trenchless installation) water line eastward t*Holly Harbor Drive. *Design and Construction of Small Interconnections: *Somerdale Court t*Oceanic Drive - approximately 275 l.f. of 4" water line *Worthington Place t*Westland Lane - approximately 550 l.f. of 4" water line *Medina Court t*Member's Club Boulevard - approximately 350 l.f. of 4" water line The selected Design-Builder will form a team with Brunswick County and execute preliminary and final comprehensive agreements for design and construction of the Southeast Area Improvement Project for a total project cost not exceeding the approved budget amount. The Total Estimated Project Budget is $3,830,000.00. All written questions or comments shall be submitted t*bob.tweedy@brunswickcountync.gov by close of business (4:30 p.m. ET) on February 13, 2024. A copy of all questions, further clarifications, and responses will be made in the form of an addendum t*this Request for Qualifications and will be provided t*all known interested Design-Builders. Any addendum will als*be posted t*the County website. Notwithstanding the foregoing, Design-Builders will be responsible for ensuring that they have all addenda. The County will not be responsible for notifying interested parties. Shortlist Confirmed.

Final Planning

Water / Sewer

$3,830,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
34
Bidding Soon
414
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

October 15, 2024

img_map_placeholder

Multiple Locations, Bolivia, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.