BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2024 at 7:00 PM

Updated January 31, 2024

Site work and paving for a road / highway in Forest Junction, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

All Bidders Must File a "Bidders Proof of Responsibility Form" With the Kenosha County Highway Commissioner on or Before 3:00 P.m. On December 15th (Form Pa-10). Bidders Proof of Responsibility Form Can Be Submitted Electronically via Email to Clement.abongwa @kenoshacounty.org. A Certified Check or Bid Bond Payable Without Condition to Kenosha County in An Amount Not Less Than Five Percent (5%) of the Bid Shall Be Submitted With Each Bid as a Guarantee That if the Bid Is Accepted a Proper Contract and Bond Will Be Executed and Filed Within Ten (10) Days After the Acceptance of The Bid. If Such Bidder Fails to Execute And File Such Contract and Bond, the Amount of the Check or Bid Bond Shall Be Forfeited as Liquidated Damages. No Bid Shall Be Withdrawn After the Opening of Bids Without the Consent of The Kenosha County Department of Public Works for a Period of Sixty (60) Days After the Time of Opening Bids. Each Bidder Agrees Upon Submission Of Bid That if the Same Be Accepted Within Said Time Period, He Shall Be Bound by the Terms of Acceptance Hereinafter Contained. The Kenosha County Department of Public Works Reserves the Right to Reject Any or All Bids Received, or to Accept Any Bid Which May Be Most Advantageous to, and in the Best Interest of Kenosha County. Each Successful Bidder Will Be Required to Furnish a Satisfactory Performance Bond in the Sum of the Full Amount of The Contract. Major Work Items and Estimated Quantities Are as Follows: Removing Asphaltic Surface Milling 32000 Sy Excavation Common 700 Cy Base Aggregate Dense 3/4-inch 1000 Ton Base Aggregate Dense 1 1/4-inch 1600 Ton Base Patching Asphaltic 1800 Sy Hma Pavement 3 Mt 58-28 S 4000 Ton Hma Pavement 4 Mt 58-28 H 3000 Ton Asphaltic Surface Driveways and Field Entrances 60 Ton Culvert Pipe Reinforced Concrete Class Iv 24-inch 240 Lf Culvert Pipe Reinforced Concrete Horizontal Elliptical Class He-iv 19x30-inch 64 Lf Concrete Curb & Gutter 30-inch Type D 300 Lf Concrete Curb & Gutter 6-inch Sloped 36-inch Type 10 Lf Concrete Sidewalk 4-inch 700 Sf Mgs Guardrail 3 825 Lf Mgs Guardrail Terminal Eat 8 Each Topsoil 3500 Sy Mulching 1000 Sy Erosion Mat Class I, Type B 2500 Sy Silt Fence 3000 Lf Seeding Mixture No. 40 65 Lb Posts Wood 4x6-inch X 14-ft 8 Each Signs Type Ii Reflective H 45 Sf Traffic Control 1 Each Marking Line Epoxy 6-inch 24000 Marking Line Epoxy 10-inch 1000 Marking Stop Line Epoxy 18-inch 200 Lf Marking Diagonal Epoxy 12-inch 900 Lf Marking Crosswalk Epoxy Transverse Line 6-inch 400 Lf Sawing Asphalt 1400 Lf Together With Appurtenant Construction in All Contracts.

Bid Results

Roads / Highways

$225,000.00

Public - County

Paving, Site Work

83

6

2

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
43
Bidding Soon
621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

April 1, 2024

Project location map

WI-32, Forest Junction, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.