Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published December 6, 2023 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Fayetteville, Arkansas. Contact the soliciting agency for additional information.
Upon signing this bid, the bidder certifies that they have read and agree to the requirements set forth in this bid proposal regarding the services being bid on and agree to furnish these services at the price stated. This price shall include labor, fuel, machinery, equipment, tools, supplies, supervision, insurance and all other accessories and services necessary to complete the items bid. Bidders should enclose proof of insurance with their bid. A City of Fayetteville Code Compliance Officer must be present at all code cleanup locations during work. It shall be at the discretion of the City of Fayetteville to determine if a site is considered "clean". If any site is not considered "clean" by the appropriate City of Fayetteville personnel, the service provider must work in a timely manner to get the site to standards acceptable by the City of Fayetteville. The Contractor may have a Lead Worker and two (2) additional workers at the site, unless otherwise directed by the appropriate City of Fayetteville personnel. Start time begins when the work crew and the Code Compliance Officer meet at the prearranged location. Time will not be accrued before meeting the Code Compliance Officer. Invoices must be submitted within seven (7) days of the completion of work for a specific site. Failure to submit invoices in a timely manner could affect future bidding consideration. Junk and debris must be dumped at the City of Fayetteville Transfer Station at 1560 Happy Hollow Rd, unless directed otherwise. The contractor must provide documentation that debris was hauled to City of Fayetteville Transfer Station at 1560 Happy Hollow Road when payment requests are submitted. The contractor must be able to start a job three (3) working days from date of notification (under normal working conditions). The contractor is responsible for being prepared with proper equipment and supplies to do each job. This includes proper supplies for cleaning up junk, debris, limbs, trash, etc. Power tools are required for securing buildings. The contractor must provide their own power source for operating the tools necessary for securing buildings. This contract is for cleaning up and securing properties within the city limits of Fayetteville, Arkansas. Large Scale Clean-ups' will be bid out separately as needed.
Post-Bid
Municipal
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2023
January 17, 2024
Multiple Locations, Fayetteville, AR
Related To This Project
Fayetteville, AR
--
Fayetteville, AR
Bid Date: Aug 28 2024
Fayetteville, AR
Bid Date: Jan 11 2024
Fayetteville, AR
--
Fayetteville, AR
Bid Date: Feb 24 2025
Fayetteville, AR
Bid Date: Jan 17 2024
Fayetteville, AR
Bid Date: Jan 23 2024
Fayetteville, AR
Bid Date: Dec 18 2023
Fayetteville, AR
Bid Date: Jan 11 2024
Fayetteville, AR
--
Fayetteville, AR
Bid Date: Oct 22 2024
Fayetteville, AR
Bid Date: Dec 15 2023
Fayetteville, AR
Bid Date: Nov 24 2023
Fayetteville, AR
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed