Site work for a civil project in Springtown, Texas. Completed plans call for site work for a water / sewer project.

Furnish and install and construct complete in place, a Booster Pump Station at the F.M. 51 Booster Pump Station Site, based upon constructing two Vertical Turbine Booster Pumps, each Rated 400 HP to include pumps, Electrical Control Building, Pump slab and Driveways, combined with all piping, valves, equipment, excavation, electrical, painting, protective coatings and complete integration into the Walnut Creek S.U.D. SCADA system for remote operation, to include all labor, tools, equipment, supplies and incidentals, Storm Water Pollution Prevention Plan and Erosion Control Measures for the Lump Sum. Each bid must be accompanied by a certified check of the bidder, or a bid bond, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of the bid. Such checks, or bid bonds will be returned to all except the three lowest bidders within thirty (30) days after the opening of bids, and the remaining check s or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract, or, if no award has been made within sixty (60) days after the date of the opening of bids, upon demand of the bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid. The successful bidder, upon his failure or refusal to execute and deliver the contract and bonds required within fifteen (15) days after he has received notice of the acceptance of his bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal , the security deposited with is bid. The Owner reserves the right to waive any informality or to reject any or all bids. The Owner reserves the right to increase or de crease the amount of work to be done by any amount not to be exceeded by twenty-five percent (25%) of the original contract amount. In the event the increase pertains to items not originally bid, the Contractor shall submit a bid in writing to the Engineer for approval. Question Deadline 01/06/2024 Every request for such interpretation should be in writing and addressed to khamilton@hamiltonduffy.com and will be given consideration, must be received at least five (5) days prior to the date fixed for the opening of bids

Bid Results

Water / Sewer

$2,789,300.00

Public - City

Site Work

15

22

2

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
60
Bidding Soon
3,451
All Active Projects
1,371
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

March 11, 2024

img_map_placeholder

To Be Determined, Springtown, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.