BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Glen Allen, Virginia. Completed plans call for the demolition of a playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The Work consists of expansion of the existing park and new construction on the Glover Park site, a 209-acre park located at 11217 Greenwood Road, Glen Allen, VA 23059. The Phase II project will complete the development of the tournament quality sports complex and provide new amenities to Glover Park. The sports field related work will add two new NCAA sized (440' center field) synthetic turf baseball fields, dugouts, bullpens, scoreboards, and new LED sports lighting. The project will complete clearing, earthwork, and grading for 4 future baseball fields, and provide two full sized (225' x 360') synthetic turf multi-purpose fields with LED sports lighting, and a new 1,770 sf restroom building. Civil engineering work will include earthwork, site grading, approximately 1,250 new parking spaces provided in multiple lots throughout the site, along with drive aisles and roads connecting the existing parking lots to the newly constructed Lambert Way; the Public Works project which will be constructing the Lambert Way entry road from Woodman Road up to the center of the site for this project's connection. The new park amenities will include dog park, a large playground, fitness station area, misting pole plaza, shade shelters throughout the site, and a stone dust 5- kilometer trail through the woods on the northern portion of the site. The utility infrastructure improvements will include water and sewer plus new sanitary pump station and storm water piping improvements/BMP's. All supporting activities required to complete the project will be included such as DEQ/Army Corps permit compliance, Henrico County POD compliance, tree clearing, storm water improvements, landscaping, irrigation, landscape architecture components, and pedestrian site light.

Under Construction

Playgrounds / Parks / Athletic Fields

$30,344,985.00

Public - County

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

171

24

78

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
102
Bidding Soon
1,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

March 11, 2024

Project location map

11217 Greenwood Rd, Glen Allen, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.