Site work and paving for a mixed-use development in Beverly Hills, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
In general, the project consists of asphalt pavement (2-inch grind and overlay), curb ramp replacements, bus pad installation, replacement of existing pavement striping and markings with the current Caltrans standard striping, removal of existing striping and markings as applicable, placement of thermoplastic and traffic-rated paint, and installation of new bikeway striping. The proposed improvement is along Burton Way from Crescent Drive to Robertson Boulevard. Some project locations will require the work to be performed at night, on weekends, or with other working hour restrictions. All questions shall be emailed to Christine Chung at cchung@beverlyhills.org. Question submission is due Monday, January 8, 2024, at 4:00pm. Any questions submitted after the due date and time will not be responded. Inquiries received via telephone, fax, or in-person will not receive a response. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 120 working day The work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements, supplies, and permits necessary for, or appurtenant to, the construction and completion of the project indicated above in accordance with the Standard Drawings and the Specifications prepared for this project. In general, the project consists of asphalt pavement (grind and overlay), curb ramp replacements, bus pad installation, replacement of existing pavement striping and markings with the current Caltrans standard striping, removal of existing striping and markings as applicable, placement of thermoplastic and traffic-rated paint, and installation of new bikeway striping. The proposed improvement is along Burton Way from Crescent Drive to Robertson Boulevard. Some project locations will require the work to be performed at night, on weekends, or with other working hour restrictions.
Award
Sidewalks / Parking Lot
$1,964,520.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2024
March 19, 2024
Burton Way, Beverly Hills, CA
Related To This Project
Beverly Hills, CA
--
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Jan 18 2024
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Jan 23 2024
Beverly Hills, CA
Bid Date: Jan 29 2024
Beverly Hills, CA
--
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Jan 16 2024
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: May 11 2021
Beverly Hills, CA
--
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Nov 01 2023
Beverly Hills, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.