Site work and paving for a mixed-use development in Beverly Hills, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

In general, the project consists of asphalt pavement (2-inch grind and overlay), curb ramp replacements, bus pad installation, replacement of existing pavement striping and markings with the current Caltrans standard striping, removal of existing striping and markings as applicable, placement of thermoplastic and traffic-rated paint, and installation of new bikeway striping. The proposed improvement is along Burton Way from Crescent Drive to Robertson Boulevard. Some project locations will require the work to be performed at night, on weekends, or with other working hour restrictions. All questions shall be emailed to Christine Chung at cchung@beverlyhills.org. Question submission is due Monday, January 8, 2024, at 4:00pm. Any questions submitted after the due date and time will not be responded. Inquiries received via telephone, fax, or in-person will not receive a response. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 120 working day The work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements, supplies, and permits necessary for, or appurtenant to, the construction and completion of the project indicated above in accordance with the Standard Drawings and the Specifications prepared for this project. In general, the project consists of asphalt pavement (grind and overlay), curb ramp replacements, bus pad installation, replacement of existing pavement striping and markings with the current Caltrans standard striping, removal of existing striping and markings as applicable, placement of thermoplastic and traffic-rated paint, and installation of new bikeway striping. The proposed improvement is along Burton Way from Crescent Drive to Robertson Boulevard. Some project locations will require the work to be performed at night, on weekends, or with other working hour restrictions.

Award

Sidewalks / Parking Lot

$1,964,520.00

Public - City

Paving, Site Work

17

9

26

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
102
Bidding Soon
2,189
All Active Projects
969
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2024

March 19, 2024

img_map_placeholder

Burton Way, Beverly Hills, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.