BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Mount Holly, New Jersey. Contact the soliciting agency for additional information.

The County of Burlington seeks bids for the provision of goods/services as per the specifications issued for the solicitation of bids titled Blast Concrete Pump, Model RD 6536 A pre-bid conference is not applicable to this solicitation. Bids MUST be accompanied by a bid guarantee in the form of a bid bond, certified check or cashier's check in the amount of TEN PERCENT (10%) OF AMOUNT BID, NOT TO EXCEED TWENTY THOUSAND DOLLARS ($20,000.00) and shall be made payable to the Board of County Commissioners of the County of Burlington. If the successful bidder fails to enter into such contract, or neglects to perform after acceptance of bid by the County, then the check or security deposited by it shall, at the option of the Board of County Commissioners, be retained as liquidated damages, or if bid bond has been supplied, the surety shall be liable for the amount of the bid bond. The County Representative is: John A. Janis, Jr., Division Head Department of Public Works Division of Roads & Bridges 251 Rancocas Road Mount Holly, New Jersey 08060 Phone: 609-726-7300 This person is designated as the County Representative for this solicitation and will be the point of contact for performance after execution of the contract. The Division of Purchasing is responsible for all contract administration matters. A performance guarantee is not required for this solicitation of bids. The surety company providing the Bid Bond must be one licensed to conduct business in the State of New Jersey. If supplying a bid bond, it must be accompanied by a Power of Attorney for the Attorney-in-Fact. All bonds submitted must be original with a raised seal. Failure to submit a bid guarantee as required by this specification shall cause the bid to be rejected. NOTE: Bidders must submit a copy of the bid guarantee online as part of the electronic bid submission. Additionally, the bidder must mail or deliver the ORIGINAL bid guarantee to the County. The original bid guarantee shall be mailed or delivered to the County in a sealed envelope with the bid title and number clearly marked on the outside. The original bid guarantee is due to the County no later than the deadline for receipt of bids. Failure to comply will result in rejection of the bid Question Cuttoff Date & Time: 12/4/2023 05:00:00 PM (ET) Bid Opening: You can also dial 173.243.2.68 and enter your meeting number. Join by phone +1-408-418-9388 United States Toll Access code: 234 955 77685 The County is not responsible for any bid not submitted on time. The County is not responsible for any internet or electronic issues that may include, but not be limited to, connection issues, technical difficulties, errors, power outages, etc. The Division of Purchasings public office hours are Monday through Friday from 9:00 AM to 4:00 PM (local time), County holidays excluded. All solicitations are subject to change. It is the responsibility of the vendor to check Electronic Portal for any future addenda, revisions, etc. prior to the opening date. Failure to do so could result in rejection of your bid submission. All work shall be completed within 180 calendar days from the date the Successful Bidder receives a signed purchase order from the County of Burlington.

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
197
Bidding Soon
3,763
All Active Projects
1,732
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

March 28, 2024

img_map_placeholder

To Be Determined, Mount Holly, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.