BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Dalton, Massachusetts. Working plans call for site work for a municipal facility.

As of February 12, 2024, No bids were received for this project. No definite date for the rebid. This project will consist of all labor and materials to repair and protect the exterior of the MassWildlife Western District Headquarters Office in Dalton, MA. The project will include the replacement of 3 sections of rotted logs, seal and caulk logs, media blast log exterior, stain and treat with approved products. Estimated Cost $40,000 The project will include the replacement of 3 sections of rotted logs, seal and caulk logs, media blast log exterior, stain and treat with approved products. SCOPE OF WORK The Western District headquarters is located at 888 Old Windsor Road in Dalton, Massachusetts. The building was constructed in the 1980s and is a "D" log frame residential style structure on a concrete foundation. The building is a single story in the front and 2 story in the back. All relevant portions of the latest edition of the State Building Code (9th Edition), and the special provisions contained herein shall apply to the work performed under this Contract. The work to be performed under this Contract shall, in general, consist of the following: 1. Repair and/or replacement of 3 sections of logs exhibiting rot. Replacement/repair shall be structurally sound and sealed against weather. Removal of a portion of the rear deck is allowable if necessary to properly repair logs. 2. Media blast building exterior (sanding may be considered as an alternative). Clean surface using compressed air or log wash solution. 3. Seal and caulk all log checks and gaps between logs using product compatible with stain to be applied. 4. Stain and seal building exterior with high quality product such as Outlast Q8 log oil or equivalent. Contractors may suggest alternative products/staining procedures which may be approved by MassWildlife. 4. Miscellaneous carpentry and exterior repairs required for the project, but not specified under some other item.

Final Planning

Municipal

$40,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
134
Bidding Soon
1,886
All Active Projects
879
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

July 22, 2024

img_map_placeholder

88 Old Windsor Rd, Dalton, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.