BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Santa Fe Springs, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of February 5, 2024, this project was awarded to R.J. Noble Company, awarded amount of $2,031,631.75. Reference Number 0000336807 The work to be done consists of furnishing all materials, equipment, tools, , and incidentals as required by the Plans and Specifications. The general items of work include, but is not limited to, asphalt concrete removal and replacement, concrete longitudinal gutter removal and replacement, PCC driveway, curb & gutter, sidewalk removal and replacement, earthwork, grading, importing and exporting base, clearing and grubbing, and painting address numbers. The Contractor must complete 100% of the construction improvements at each alley segment prior to starting the construction of the next segment. The alley segments correspond to the construction plans and are as follows: Segment 1 - Alley 1A, 1B, 1C Segment 2 - Alley 2A, 2B Segment 3 - Alley 2C, 2C-1, 2D Segment 4 - Alley 3A, 3B The Contractor will be required to provide resident vehicle access via the alley segments throughout the entire duration of construction activities. At least one of the alley driveways must allow for residential vehicles access throughout the duration of the project. The Contractor will provide a temporary driveway access ramp at each alley entry/exit segments. Job Alleyways - Santa Fe Springs Question Deadline 01/02/2024 at 5:00 PM PT Questions are submitted online Yes. General Requirements - Certified Payroll - Contractors License Required - Insurance Required - License Required - Prevailing Wage Required The Bid must INCLUDE a certified or cashier's check, or bidder's bond, made payable to the City of Santa Fe Springs as AGENCY, for an amount no less than 10 percent of the amount bid. A and materials bond and performance bond are prerequisites before contract execution, in the form and amount outlined in the contract documents. Performance Bond 100 % - and Materials Bond 100 % . ENGINEER'S ESTIMATE: $1,600,000 *The AGENCY reserves the right to reject any or all bids, to waive any irregularity in any bid received, and to be the sole judge of the merits of the respective bids received and to take all bids under advisement for a period of 30 days.

Award

Sidewalks / Parking Lot

$2,031,632.00

Public - City

Paving, Site Work

29

6

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
235
Bidding Soon
3,761
All Active Projects
1,711
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 10, 2024

March 11, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Santa Fe Springs, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.