Site work for a civil project in Rumson, New Jersey. Working plans call for site work for a water / sewer project.

The Borough experienced a major failure in the sanitary sewer force main pipe leaving the Grant Avenue Pump Station before it crosses under the Shrewsbury River this past May. Our Borough DPW and Staff along with emergency utility contractors quickly made temporary repairs to maintain sewer service in the community and avert a potential environmental catastrophe. The New Jersey Department of Environmental Protection was alerted at the initial observance of the force main failure and had their field agents working with us throughout the repairs. After evaluating the failed force main pipe section and assessing the likelihood of a subsequent failure, it was determined that installing a new force main under the Shrewsbury River would be the most cost effective and reliable approach to maintaining service to the community. In accordance with emergency acquisition protocol, the Borough contracted Colliers Engineering and Precise Construction to design and install a directionally drilled force main system under the Shrewsbury River. The new force main will actually consist of two 14" high density polyethylene pipes (HDPE) parallel to each other drilled to a depth of 25' below the river channel bottom. The dual pipe system does not add conveyance capacity, but does allow for internal pipe inspection a feature the existing single pipe system does not have. It is anticipated the work will take approximately 6 weeks to complete. All work is anticipated to occur within normal working days and hours. This construction method is similar to the recently completed New Jersey Natural Gas and New Jersey American transmission mains installed under the river at the end of Old Rumson Road. Typical utility construction related inconveniences are expected, but sanitary sewer service is expected to remain in full operation throughout the project. We look forward to working on this very important Borough project and ask for your patience as the work gets underway. If you have any questions related to this project, please contact David Marks, Rumson Borough Engineer, via email at dmarks@rumsonnj.gov.

Final Planning

Water / Sewer

$400,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
166
Bidding Soon
4,204
All Active Projects
1,848
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2024

img_map_placeholder

Multiple Locations, Rumson, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.