BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Renovation of a mixed-use development in Austin, Texas. Completed plans call for the renovation of a library; and 172,995-square-foot laboratory facility.

As of October 30, 2025 this project is underway. An architect and construction manager have been identified. Completion is expected in December of 2027. Original solicitation below for reference: The proposed project entails renovation of the existing Life Science Building constructed in 1970 and the construction of a multi-story state of-the-art addition to the building. One of the most heavily used buildings on campus, the Life Science Building is occupied by the College of Science and includes the Departments of Biology, Psychology, and Bioengineering, and the Animal Research Facility. The new construction addition will include flexible, high-tech interactive classrooms, teaching labs, as well as wet and dry research labs, all of which will have a positive impact on student success and increase the value of research and teaching. Approximately 18,065 gross square feet will be left as research shell space. The renovations in the existing building will address replacement of infrastructure including life safety systems, heating, ventilation, and air conditioning (HVAC) systems, and electrical upgrades. The building exterior façade will be replaced to resemble the new additions in stone, metal panel, and glass, and the project will address approximately $23,000,000 in deferred maintenance, including asbestos abatement. The proposed increase in the total project cost results from the change from repair of mechanical, electrical, and plumbing systems to replacement of the systems, updated laboratory safety code requirements including increased electrical panel and circuit sizes, larger electrical rooms, running additional gas lines and more rigorous HVAC systems. Additionally, a new building generator is required for capacity to support renovated teaching labs and new research labs. This project is included in the city’s 2024-2029 Capital Improvement Program. As of December 7, 2023, construction is slated to begin January 3, 2024 with achieve final completion of December 2, 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Laboratories

$180,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
128
Bidding Soon
2,811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.