BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Springfield, Oregon. Completed plans call for the addition of a 5,600-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

RFP 002-2023 General Contractor General Contractor for their Willamalane Preschool at Bob Keefer Center Expansion Project. The objective is to remodel a portion of the existing Willamalane Preschool at Bob Keefer Center, which will add 3 new classrooms to the program. The approximate square footage being renovated is 5,600sf. Scope: Renovations at existing Willamalane Bob Keefer Center. Interior demolition Minor updates to existing classrooms Modification to existing classroom Two new bathrooms Two new storage areas Two new classrooms Modification to existing kitchen Finish updates throughout space Construction Budget: Current estimate is approximately $600,000. Competitive Range: The competitive range following the evaluation described in Part C is anticipated to be four, but will be determined upon review of the responsive proposals received. Schedule: Construction Phase: Start upon issuance of GMP Amendment, January 16, 2024. Complete at project final completion and acceptance, anticipated by July, 2024. The Evaluation Committee will forward a recommendation for selection of one firm to Willamalane Park and Recreation District's Board of Directors for consideration of award. Selection of the successful firm will be entirely at the discretion of Willamalane Park and Recreation District, and Willamalane Park and Recreation District reserves the right to waive minor irregularities in the selection process and to reject any and all proposals. -ALTERNATES - add new floor and base finishes at kinders 143 and 144; remove existing finishes and prep surfaces for new finish. -add new carpet floor and base finishes at hall h105; remove existing finishes and prep surfaces for new finish -remove counter shutter and patch wall at multi-purpose room 147. -add new bottle filler at classroom 143,144, and 147 -add new adult restroom 158. plumbing rough-in included in base bid

Award

Educational

$717,814.00

Public - City

Addition, Demolition, Renovation, Site Work

36

12

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
14
Bidding Soon
172
All Active Projects
83
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

January 16, 2024

img_map_placeholder

250 S 32nd St, Springfield, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.