Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

The City of Sarasota is soliciting bids for the construction of a 30-inch DIP Raw Water Main Crossing I-75 (Verna). Work includes erosion and sediment control, MOT, temporary steel sheet piling or trench box installation and removal, groundwater dewatering, raw water pumping and disposal, removal and reinstallation of FDOT's precast concrete noise walls, removal and disposal of grand oak tree trunk, installation of line-stops and cast-in-place Reverse Thrust Block, installation of ductile iron piping by slip-line and open-cut, installation of 30" mechanical joint fittings and appurtenances, and ground stabilization and final restoration. Pricing shall include all labor, material, equipment, testing, tax, overhead, and profit necessary to install, construct, and place into service the items described in this bid to provide a complete and functional system ready for use by the City. Q & A deadline: Jan 03, 2024 5:00:00 PM EST 60 calendar days from the Notice to Proceed, with the Final Completion of all Work within the Contract Time of 75 calendar days from the Notice to Proceed for 30-INCH DIP RAW WATER MAIN CROSSING I-75 (VERNA) -CONSTRUCTION. The Work generally includes: 1. Erosion and sediment Control. 2. Maintenance of traffic within the Florida Department of Transportation's right of way. 3. Temporary steel sheet piling or trench box temporary installation and removal 4. Groundwater dewatering. 5. Raw water pumping and disposal. 6. Removal and reinstallation of FDOT's precast concrete noise walls. 7. Removal and disposal of grand oak tree trunk. 8. Installation of line-stops and cast-in-place Reverse Thrust Block. 9. Installation of ductile iron piping by slip-line and open-cut. 10. Installation of 30" mechanical joint fittings and appurtenances. 11. Ground stabilization and final restoration according to FDOT specifications.

Bid Results

Water / Sewer

$1,592,126.00

Public - City

Site Work

8

10

15

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
45
Bidding Soon
877
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 11, 2024

img_map_placeholder

To Be Determined, Sarasota, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.