BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a mixed-use development in New Century, Kansas. Completed plans call for the construction of a 8,910-square-foot, one-story above grade municipal facility; 6,200-square-foot, one-story above grade warehouse / distribution facility; and 5,680-square-foot, one-story above grade warehouse / distribution facility.

The project consists of 3 new pre-engineered metal buildings and associated site work. The complex will consist of a 8,910 SF Subarea office & shop; a new 6,200 SF equipment storage building and a new 5,680 SF salt/sand bunker, brine/magnesium chloride tanks and a fuel island. The work includes site demolition, earthwork, asphalt paving, site concrete, site utilities, landscaping, cast-in-place concrete, concrete floor finishes, unit masonry, metal fabrication, rough carpentry, thermal insulation, laminate architectural cabinets and countertops, joint sealants, doors/frames/hardware, sectional doors, aluminum windows, gypsum board assemblies, acoustical ceilings, resilient flooring, resinous flooring, painting, signage, toilet & bath accessories, visual display units, metal lockers, blinds, metal building systems, fire protection specialties, wall protection, fire sprinkler, plumbing, HVAC, and electrical. BLDG NO.'S: 27600-12144, -00145 & -12146 Value: $3,000,000 to $5,000,000 Budget: $4,728,570 All contractors bidding as the prime bidder on this project must be pre-qualified with Office of Facilities and Property Management to bid this project. For instructions on pre-qualification go to website. Questions concerning the Instructions to Bidders, Form of Contract, Insurances and Bonds shall be addressed to the Office of Procurement and Contracts, Department of Administration, Suite 451S, 900 S.W. Jackson Street, Topeka, Kansas 66612, telephone (785) 296-0002. The undersigned agrees to have the work of the project to a point of final completion, including all punch list items, ready for the Project Architect/Engineer's final inspection and the Owners and Office of Facilities and Property Managements acceptance, in 365 Calendar days (or less) following issuance of the written Notice to Proceed.

Award

Municipal

$4,334,000.00

Public - State/Provincial

New Construction

61

31

15

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
32
Bidding Soon
718
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2024

March 18, 2024

img_map_placeholder

To Be Determined, New Century, KS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.