BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Bridgeport, Washington. Completed plans call for the renovation of a military facility.

Contract Award Date: Feb 13, 2024 Contract Award Number: W912DW24P0014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JTMGKVB84KB9 Contractor Awarded Name: UNITED SALES ASSOC INC Contractor Awarded Address: Lake Oswego, OR 97035 USA Base and All Options Value (Total Contract Value): $144,000.00 MATERAILS REQUIRED: Materials will be inspected at the delivery point prior to acceptance. Contractor shall be responsible for maintaining the product's condition as specified until the point of acceptance. Vendors shall supply the following items in the sizes and quantities specified to satisfy the requirements of this contract. New equipment only; no remanufactured or "gray market" items. All items must be covered by manufacturer's warranty. DELIVERY LOCATION: US Army Corps of Engineers Chief Joseph Dam Highway 17 and Pearl Hill Rd Bridgeport, WA 98813-1120 Note: All items shall be delivered FOB destination to Chief Joseph Dam within 150 days of contract award. No shipments are allowed other than normal business hours of Monday through Thursday 0700 - 1600, excluding federal holidays. Contractor shall supply eight (8) inverters to the specification below. All eight inverters shall be identical in make and model to each other. INVERTER SPECIFICATIONS: 5kVA Inverter DC Input: Voltage: 125VDC Nominal Low Voltage Cutoff: 105-110VDC High Voltage Cutoff: 140-150VDC DC Low Voltage Reset: 115VDC Current: 34-40A DC AC Line Input: Voltage: 105-135 VAC, 120VAC Nominal Frequency: 58.5 - 61.5 Hz, 60 Hz Nominal Current: 30-50A AC Output: Voltage: 120VAC Frequency: 60Hz Current: 30-50A AC Maximum Pad-lockable Circuit Breakers for both DC input and Bypass circuits. Cable Entry for the inverter shall be from the bottom. PCB Conformal Coating Fungus and Moisture Proof Front Panel Display: Display shows at a minimum Model Number, Serial Number, KVA, Voltage (DC, AC, Bypass), Amperage (DC, AC, Bypass), Hertz, Date and Time Display has detailed indications showing critical information to the user, such as normal and abnormal conditions, faults, and troubleshooting information for the inverter. Annunciation on the panel should contain the following (at a minimum): Bypass Source Failure Bypass Supplying Load Fan Failure - If manufacture recommends fan cooling. Inverter Failure Low DC Voltage DC Breaker Open High DC Voltage Ground Fault (with ability to disconnect if affecting plant ground fault detection) Overtemperature Low AC Output Voltage High AC Output Voltage Fuse Blown Overload Shutdown Annunciation shall have a test alarm function. Communications - Modbus TCP Humidity: 0 to 95% with no condensation Inverters shall conform to UL 1778 and NEMA 250. The inverters steady state output voltage regulation shall not change more than +/- 2 percent under any of the following conditions: 0-100 percent and 100-0 percent load change Minimum to maximum DC bus voltage The harmonic distortion shall be less than 5 percent total harmonic distortion. Overload Capability: The inverters shall, at a minimum, be capable of suppling loads up to 100 percent of the rated load continuously, 125 percent of the rated load for a minimum of 10 minutes without transfer to the bypass, 150 percent of the rated load for 1 minute without transfer to the bypass. Over Temperature: Upon heat sink over temperature, the inverters shall automatically transfer the load to the bypass source. If the overtemperature occurs for more than 60 seconds, the DC/battery input breaker shall trip protecting the bridge from damage. Manual retransfer of the load onto the inverters shall be permitted only after the temperature returns to normal. Cooling: The inverter shall be designed for ambient temperatures of 0 to 40 degrees Celsius, and forced air cooled if recommended by manufacture in those ambient temperatures. Audible noise at 1.5 meters shall be less than 72 dBA Each inverter efficiency shall be at least 85 percent at full load. The inverters shall include a high-speed, static transfer switch. It shall provide an automatic transfer of the load to the bypass if any of the following conditions occur: The inverter bridge fails. The inverter overcurrent condition occurs. The inverter outputs an over/undervoltage +/- 10 percent for longer than 1 cycle. Low DC disconnect. The manual pushbutton is operated. Inverters shall have a manual bypass switch. The manual bypass switch for each inverter shall be an integral part of the inverter that is a make-before-break switch used to bypass the inverter and static transfer switch for maintenance purposes. An indicator light shall be provided to indicate the following conditions (as a minimum): Bypass and normal source in-sync Bypass source available Normal source available There shall be a front cabinet accessible means for testing the indicating lights of each manual bypass switch. Each manual bypass switch shall have three (3) positions as follows: Normal - Load fed from inverter. Test - Load fed from bypass source through manual bypass switch. Bypass - Load fed from bypass source, completely isolating the manual bypass switch and the inverter. Spare parts: At a minimum, provide two of each printed circuit board, spare fuses, spare fans, and provide spare consumables used for maintenance. Footprint mounting shall not exceed 36" x 36". All software and licensing for inverters will be supplied. Inverters will come with two complete sets of Operation and Maintenance Manuals as well as Drawings for troubleshooting.

Award

Military

$144,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
72
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

February 23, 2024

img_map_placeholder

Pearl Hill Rd NE, Bridgeport, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.