BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Cincinnati, Ohio. Completed plans call for the renovation of a educational facility.

This download is available by selecting Electronic Delivery for the delivery method. Orders can be picked up at any of our three (3) locations. Please call Jerry 614-899-6180 if you have any further questions A. University: "University of Cincinnati", "UC", "Owner" and the "Contracting Authority" as listed in the Supplementary Conditions. B. Furnish: Purchase and deliver to project site, ready for installation. C. Install: Unpack, assemble, set in final position, fasten in place, make final connections, clean, adjust, and leave ready for use. D. Provide: Furnish and install. E. Receive: Accepting a delivery. F. Final Connections: Complete connections as required and recommended by manufacturer for optimum operation of equipment. G. Drawings, Use of: Do not scale the Drawings. If the contractor chooses to calculate measurements by scaling the Drawings, it is at their own risk and is not considered to be an accurate measurement. The contractor is responsible for the accuracy of measurements, elevations, lines, etc. of the Work. 1.6 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of the Project is defined by the Contract Documents and consists of the following: 1. Installation of new emergency responder radio equipment and fire alarm monitoring connections. B. Contractor's construction progress schedule showing the sequence, commencement and completion dates, and move-out and-in dates of the University to be included as part of the work and carefully coordinated with the University prior to the state of the work. 1.7 ACCESS TO THE SITE AND PARKING A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings, by The General Conditions, and in accordance with the Supplementary Conditions. B. Use of the Site: Limit use of Project site to areas within the Contract limits indicated or, where not indicated, as determined with UC Project Manager. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Driveways, Walkways and Entrances: Keep driveways loading areas, and entrances serving premises clear and available to University, University's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. All deliveries, offloading and other activities required by the scope of work shall be previously approved by the UC Project Manager and in accordance with the Contracting Requirements in the Supplementary Conditions. b. The Contractor shall validate with the University, City, County, or State agency as to the status of road work impacting traffic flow on, to, and from, campus. 2. Streets: Anticipated work affecting traffic flow shall be coordinated with the Project Manager. A detailed plan of the route to be used shall be submitted to the Project Manager for approval if requested. If temporary controls are needed the Project Manager. a. Any mud and/or spillage from public and/or University street shall be removed without delay. If mud and/or spillage is not removed the Contractor shall be responsible for cost as a result of the University or public agency cleaning of the street. b. Any damage to public and/or University streets resulting from hauling, storage of materials, or other activities related to the work shall be repaired or replaced, at no expense to the University, by the Contractor causing the damage. c. If, in coordination with the Project Manager, it is determined that traffic may be hazardous to traffic and/or pedestrians, a uniformed traffic control officer shall be employed as coordinated with the University at the contractor's expense 3. Parking: Parking for employees of Contractors and subcontractors must secure parking permits from the University and must park cars in area assigned to them. Parking on streets or in restricted areas is prohibited. At the beginning of the work, each contractor shall report to the University the approximate number of parking permits which will be required for all employees, including employees of subcontractor. 4. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weather-tight condition throughout construction period. Repair damage caused by construction operations.

Award

Educational

$377,720.00

Public - City

Renovation

10

8

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
132
Bidding Soon
2,208
All Active Projects
1,127
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 30, 2024

February 29, 2024

August 21, 2024

img_map_placeholder

231 Albert Sabin Way, Cincinnati, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.