BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Marion, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The general nature of the work on which bids are requested is: 1254 LF of curb and gutter removal, 1254 LF of 24" PCC curb and gutter, 1278 LF of 6" HDPE Subdrain, 5 Subdrain Cleanouts, 140 LF of 24" RCP Storm Sewer, 2 Storm Sewer Manholes, 29 SY of 7" PCC Pavement, and miscellaneous related work and appurtenances in accordance with the contract documents. 10% bid bond Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the contract.. Upon completion of the project and before final acceptance by the City Council, the contractor will be required to post a maintenance bond (2-year for sewer or 4-year for paving) or be required to pay the City 1.5 percent of the final contract amount to pay for the applicable maintenance bond. Such 1.5 percent shall not be refundable to the contractor and the City will act as the bonding agent. Posting of the maintenance bond or the cash payment will be the election of the City Engineer, all in accordance with Ordinance 77-21 of the City of Marion In lieu of a maintenance bond, the performance and payment bonds may provide coverage for the specified maintenance term. A separate and distinct statement to this effect must be included on the bonds. Work shall commence ne earlier than May 28th, 2024, and no later than August 5th, 2024, and be completed within 40 working days. Liquidated damages in the amount of $300.00 per working day will be assessed for work not completed within this time.

Bid Results

Roads / Highways

$173,312.00

Public - City

Paving, Site Work

12

3

5

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
35
Bidding Soon
995
All Active Projects
311
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 9, 2024

May 28, 2024

July 23, 2024

img_map_placeholder

Multiple Locations, Marion, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.