Site work and paving for a sidewalk / parking lot in Davenport, Iowa. Completed plans call for site work for a sidewalk / parking lot.

The City Engineer or his designated representative shall be the Project Manager for this project. The proposed improvements include, not limited to, milling off the existing asphalt surface, full depth patching, and Hot Mix Asphalt (HMA) resurfacing at the City of Davenport Compost Facility. Actual as-built quantities may vary from bid quantities. The contractor will not be paid any premium for variations in quantities. Before the start of construction, the Contractor shall submit a line of march and schedule of work listing critical path items. The list of items shall include headers, milling, patching, surface course, base course and other items, as required, to establish a time schedule for the project. Contractor shall furnish an as-built (SIP) schedule plan to indicate the work tasks completed and the respective sequencing/actual start dates/actual finish dates and overall compliance with the schedule of work noted below. No work shall start without the approval from the Engineer or his representative. After milling and cleaning has taken place, the Engineer or his representative will immediately begin determining if full depth patching or other repairs to the existing pavement are required. If patching or repairs are not required, surface course shall be placed within two (2) working days of milling. If the lot does require full depth patching or repairs, surface course shall be placed within three (3) working days after milling. Once repairs have started, the Contractor shall continuously work on repairs until completion. If work ceases on repairs for any reason other than the weather, the Contractor shall be charged double working days on the program until the repairs are complete. If the above noted procedures are not followed, liquidated damages of $1,000/ day shall be charged to the Contractor for each working day not in compliance. The Contractor shall start work no later than June 3 rd , 2024. Working days shall begin when the Contractor installs barricades/partitions, begins milling operations, or June 3 rd , 2024, whichever is earlier. Work shall be completed in 5 working days or less, including final cleanup. Liquidated damages of $1,000.00/ day shall be charged to the Contractor for each working day over the allotted time. Question Deadline 12/15/2023 at 9:00 AM CT

Award

Sidewalks / Parking Lot

$71,260.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
57
Bidding Soon
1,055
All Active Projects
424
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 29, 2023

June 3, 2024

img_map_placeholder

2707 Railroad Ave, Davenport, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.