BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling of a water / sewer project in Santa Clarita, California. Completed plans call for the remodel of a water / sewer project.

Question Deadline 12/22/2023 at 12:00 PM PT All questions and clarification requests regarding the RFP must be submitted through the online portal. RESPONSES TO QUESTIONS 12/28/2023 SCOPE OF WORK: Renovation of an existing 1630 sq ft Board Room 1. Demolition of existing wall paneling to be replaced with 3/4" thick laminated new flush wall paneling & cabinet doors where applicable. 2. Build and install (1) 18ft radius desk, (1) 5ft desk, (1) 14ft desk along with (1) podium, all with quartz countertops. 3. Reconfigure existing wall cabinetry to accommodate new floor plan. 4. Removal of existing suspended ceiling grid and soffits to accommodate new ceiling plan. 5. Relocation of existing HVAC ducting and fire sprinklers to accommodate new ceiling plan. 6. Reuse existing circuitry and remove and relocate room lighting, per new ceiling plan. 7. Framing of (1) new dividing partition wall and reconfiguration of existing soffits to accommodate new ceiling plan. Wall to include appropriate sound proof insulation and fire rated insulation. Goal is to ensure rooms (new conference room and new board room) are sound proof. 8. Install new suspended ceiling in entire new room(s) per new floor plan. 9. Removal of (1) existing accordion door system and track. 10. Remove (2) existing double door systems and replace with single commercial fire rated doors including panic hardware. New door systems to include sound proof and fire rated doors. 11. Install new drywall and paint where applicable. Ensure appropriate insulation and sound proof barriers where applicable. 12. Removal of existing floor tile and carpet to be replaced with 1630 sq ft new 24"X24" carpet tile. 13. Provide value engineering approach to identify and eliminate unwanted costs and make the project cost effective and improve function and quality.

Award

Water / Sewer

$513,520.00

Public - City

Remodeling

6

9

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
107
Bidding Soon
2,241
All Active Projects
1,001
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

February 26, 2024

img_map_placeholder

27234 Bouquet Canyon Rd, Santa Clarita, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.