Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Los Angeles, California. Working plans call for the renovation of a educational facility.
*As of August 15, 2024, project is still in design development. Final bidding for the 2 Shortlisted General Contractors is expected to happen towards the end of October 2024. Anticipated Issuance of Notice to Proceed October 2024 The project is anticipated to be completed no later than the third (3rd) quarter of 2029. Requests for Clarification/Information (RFC/RFI) Due 3:00 p.m., January 8, 2024 The proposed Project consists of the construction of new school buildings, and the demolition of aging and deteriorating buildings. The Project scope also includes interim facilities, as necessary, to accommodate the temporary displacement of any facility and its associated function during construction. 2.1 Detailed Scope of Work The scope of the proposed Project includes, but is not limited to: A. Construction of a new Gymnasium Complex, 5 Specialty classrooms including Ceramics, Music, Drama, Dance and Sports Medicine, and a new Maintenance and Operations yard and building. B. Demolition of Shop Building and Gymnasium Building C. Demolition of relocatable restroom building and ticket booth D. Exterior painting of remaining buildings, (except Greenway Arts Building) to provide a uniform appearance. E. Interim facilities in existing campus spaces as required. F. Upgrade/restoration of any campus areas as impacted by interim facilities. G. Utility Upgrades necessary to complete project scope: 1. New or upgraded Sanitary Sewer Lines 2. New or upgraded Storm Water Lines 3. New Water Lines 4. New Fire Water Lines and New on-site Fire Hydrants as required 5. Electrical and Low Voltage & Fire Alarm 6. Replacement of main electrical switch gear at Main DWP Transformer. H. Improvements to landscape, hardscape, parking, and site lighting within Development zone. I. Upgrades as needed to fence, fixtures and equipment, gates, and other upgrades as required to support the new facilities. J. Improvements as required by the Americans with Disabilities Act (ADA), Division of the State Architect (DSA), California Environmental Quality Act (CEQA), Department of Toxic Substances Control (DTSC), and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements. K. Utility agency approvals and connections. L. Approvals from other Regulatory Agencies as required. M. Coordination of District furnished furniture and equipment (FF&E). N. The District has prepared an initial HREH report for this school site and a CEQA interpretive program will not be required. District has established participation goals to attain twenty-five percent (25%) of the contract dollars going to certified SBE/MicroSBE and five percent (5%) going to VBE/DVBE. All Proposers shall implement policies, procedures and methods to meet these goals, which may include but not be limited to the procurement of supplies, equipment, technical services, and/or other services under this contract.
Final Planning
Educational
$103,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2024
February 13, 2025
7850 Melrose Ave, Los Angeles, CA
Related To This Project
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Dec 14 2023
Los Angeles, CA
Bid Date: Jan 04 2024
Los Angeles, CA
Bid Date: Jan 04 2024
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.