Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Center, Texas. Contact the soliciting agency for additional information.
The City of Center through its agent, the Texas Department of Transportation (TxDOT), intends to engage a qualified firm for services. This solicitation is subject to 49 U.S.C. 47107(a)(17) and will be administered in the same manner as a solicitation conducted under Chapter 2254, Subchapter A, of the Texas Government Code. TxDOT Aviation Division will solicit and receive qualification statements for professional services as described below: Airport Sponsor: City of Center, Center Municipal Airport; TxDOT CSJ/Project No.: 24ALCENTR. The TxDOT Project Manager is David Kirkpatrick. Scope: Prepare an Airport Layout Plan (ALP) with Narrative. 1. Prepare an ALP with Narrative consistent with the most current FAA Advisory Circulars and Standard Operating Procedures, to include the following sheets: a. Coversheet b. Airport layout drawing c. Data sheet d. Terminal area plan e. Airport airspace drawing f. Inner portion of the approach surface drawing g. On-airport land use drawing h. Off-airport land use drawing i. Airport property map (Exhibit A) j. Runway departure surface drawing k. Utility drawing l. Airport access plans m. Other sheets as necessary 2. Incorporate FAA AGIS requirements and data collection as needed, including an - 18B obstruction survey, and upload data to the FAA's Airport Data and Information Portal. 3. Develop a Capital Improvement Plan, including a recommended phasing plan and financial overview that considers local, state, federal, and alternative funding sources; 4. Establish phased, attainable goals for airport improvements and development based on a forecast for aviation demand and current and future critical aircraft; and 5. Consider the emergence of Unmanned Aircraft Systems and Advanced Air Mobility and incorporate any planning in the narrative, to include vertiport siting; 6. Develop and adopt into local zoning airport height hazard protection and airport land use compatibility measures, including associated maps, to ensure the protection of the public investment in the airport; 7. Per FAA SOP 8.00, review any existing RSA determinations and update as needed or complete a determination for any runway that does not have one. If an RSA study is needed, that study will be conducted as part of this planning effort. A list of follow-on projects or studies will be a deliverable of this task. Please contact TxDOT Aviation for any technical or procedural questions at (800)68-PILOT (74568). For procedural questions, please contact Noemi Rios, Contract Specialist at 512-506-5947. For technical questions please contact David Kirkpatrick, Project Manager. For questions regarding responding to this solicitation in eGrants, please contact the TxDOT Aviation help desk at 1-800-687-4568 or avn-egrantshelp@txdot.gov The method of contractor selection has not been determined at this time. TXDOT - RFQ - Center Municipal Airport
Conceptual
Transportation Terminals
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2024
Highway 7, Center, TX
Related To This Project
Center, TX
Bid Date: Feb 01 2024
Center, TX
Bid Date: May 30 2024
Center, TX
Bid Date: Mar 05 2024
Center, TX
Bid Date: Mar 19 2024
Center, TX
Bid Date: May 02 2024
Center, TX
Bid Date: May 02 2024
Center, TX
Bid Date: May 09 2024
Center, TX
Bid Date: Jun 06 2024
Center, TX
Bid Date: May 09 2024
Center, TX
Bid Date: Nov 15 2023
Center, TX
Bid Date: Oct 24 2023
Center, TX
Bid Date: Nov 01 2023
Center, TX
Bid Date: Feb 18 2020
Center, TX
Bid Date: Jul 23 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.