BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Henderson, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of February 20, 2024 project was awarded to Yeager Materials, awarded amount is $4,115,140.98.** Bidders and DBE subcontractors must be prequalified with the Kentucky Transportation Cabinet and possess a Certificate of Eligibility at time of bid opening. A DBE goal of 3% has been established for this project. All other subcontractors must be prequalified when accepting subcontracts. Prevailing wages apply to this project. Monthly inspections will be conducted by representatives of "Stephen Sewell, PE, PTOE", the project designers. Detailed weekly inspections will be provided by "Doug Boom, PE", a representative of "City of Henderson" and will include similar review of site conditions and inspection reports as those for daily inspections with emphasis on construction quality and questions related to design intent. A 5% Bid Bond is required with the contractors bid. The successful bidder will be required to provide a payment and performance bond in the amount of 100% of the bid. The City of Henderson reserves the right to reject any and all bids and accept the Lowest Responsive and Responsible Bidder. PRIMARY COMPLETION DATE December 15, 2024; Liquidated Damages will be charged at a rate of $700.00 per day after the completion date. Project will follow current Kentucky Standard Specification and Bridge Construction and all contractors and subcontractors must be prequalified with the Kentucky Transportation Cabinet. Prime contractors and DBE subcontractors must be prequalified at the time of bid opening, all other subcontractors must be prequalified when accepting subcontracts. The project will be awarded to the lowest responsive and responsible bidder and any change orders will require prior approval from City of Henderson and KYTC. MBE (4.8%), WBE (6.9%), Set Aside(s) MBE (5%), WBE (7%), DBE (3%)

Award

Roads / Highways

$4,115,141.00

Public - City

Paving, Site Work

164

15

8

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
19
Bidding Soon
395
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

March 4, 2024

img_map_placeholder

Wathen Ln, Henderson, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.