Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2025 at 8:00 PM
Updated March 19, 2025
Site work and paving for a road / highway in Fort Pierce, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Project Development and Environment (PD&E) Study St. Lucie County seeks sealed qualification packages from qualified firms or individuals to perform professional engineering/design services related to the fuel tank expansion project, as listed in Request for Qualifications No. 24-044. Evaluation criteria for this Request for Qualifications is as follows: 1. Qualifications and ability of Firm and professional personnel (maximum of 40 points), including: Qualifications of Firm; Qualifications of proposed team; Qualifications of proposed subconsultants, if any; and Recent, current, and projected workload of the Firm, and willingness to meet contract time requirements; 2. Prior/Current Performance on projects (maximum 40 points), including: The prior and/or current performance of the Firm and all professionals proposed for use on the team in the planning, design, and administration of project(s) performed. References for a minimum of three projects for the Firm/proposed subconsultants and at least five projects on which individual team members were involved are required. To potentially achieve a high ranking here a higher number of relevant, comparable projects for the Firm and/or its team members should have been performed, backed by positive, verifiable references. Projects should be completed as recent as possible, but no later than in the past ten years. 3. Technical Approach / Methodology (maximum 20 points), including: The Firms demonstrated understanding of the Countys objective(s); and The Firms proposed work plan to achieve those objective(s). The County in its sole discretion, reserves the right to reject any and all proposals, accept any proposal or any combination of proposals, or waive any minor irregularity or technicality in proposals received and may, at its sole discretion, request a re-qualification, when in its sole judgment, it will best serve public interest. CAUTION: It is the bidders/proposers responsibility to ensure that bids/proposals/qualifications are received in the Purchasing Division prior to the date and time specified above. Receipt of a bid/proposal/qualification in any other County office does not satisfy this requirement. St. Lucie County is an Equal Opportunity/Affirmative Action Employer. Participation by small, minority-owned, and women-owned businesses is encouraged. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$8,500,000.00
Public - County
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
Edwards Rd, Fort Pierce, FL
Related To This Project
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
--
Fort Pierce, FL
Bid Date: Jan 23 2024
Fort Pierce, FL
Bid Date: Jan 31 2024
Fort Pierce, FL
Bid Date: Jan 29 2024
Fort Pierce, FL
--
Fort Pierce, FL
Bid Date: Apr 03 2024
Fort Pierce, FL
--
Fort Pierce, FL
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
