Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Stillwater, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 18 (Bailey Road) and Settlers Ridge Parkway intersection: 1) signal or roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design along with public engagement will determine the final project scope, right-of-way acquisition required, and cost estimates, which will be included in a future capital improvement plan. Project is included Washington County Fiscal Year 2024-2028. As of June 20, 2024, a design team has not been identified. Construction is funded for FY2026. The Washington County Public Works Department is issuing this request for proposals (RFP) to provide project coordination, data collection, stakeholder engagement, and engineering services for the County State Aid Highway (CSAH) 18 (Bailey Road) and Settlers Ridge Parkway/Cottage Grove Drive Intersection Improvement Project. This project has been awarded $2,000,000 in HSIP funding to install a roundabout at this intersection. The full HSIP application is attached to this RFP. All reports/documentation must be developed and presented in Microsoft Office and all design files must be developed and presented in MicroStation adhering to Washington County approved formats unless otherwise noted or requested by the Consultant (the selected firm to perform this work) with approval of the County. The role of the selected Consultant team will be to complete all tasks necessary to take the project to a municipally-approved preliminary layout and a MnDOT State Aid and municipally-approved construction plan set. Washington County will partner with the City of Woodbury and will act as the lead agency through all aspects of the project. The County's role as lead agency does not preclude direct and regular interaction between the Consultant and the City, Watershed Districts, and other agencies. External Agency input and review is important; however, the County is to be kept informed of agency dialogue and will assist the Consultant in determining the need and scope of interaction with a particular agency. The City of Woodbury will need to be involved in the design development and review and other intermediate completion points, and their input will be incorporated on a regular basis to avoid review delays or reworking of design elements. The county reserves the right to reject any or all proposals. Any questions regarding this RFP should be directed via email to andrew.giesen@co.washington.mn.us by 3:00 PM on Tuesday, January 2, 2024. If a question pertains to a clarification of this RFP, the question and answer will be posted on the County's website.
Conceptual
Roads / Highways
$4,000,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
Multiple Locations, Stillwater, MN
Related To This Project
Stillwater, MN
--
Stillwater, MN
--
Stillwater, MN
Bid Date: Jan 11 2024
Stillwater, MN
Bid Date: Jan 25 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: Mar 08 2024
Stillwater, MN
--
Stillwater, MN
--
Stillwater, MN
Bid Date: Jan 25 2024
Stillwater, MN
Bid Date: Feb 15 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: Nov 22 2023
Stillwater, MN
Bid Date: Nov 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.