BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a municipal facility in Port Angeles, Washington. Working plans call for the construction of a municipal facility.

As of December 11, 2023, an engineer has been selected and this project is in the final planning phase. It is anticipated bidding will commence in January-February 2024. Construction is expected to start in 2024, with delay possible if bids exceed available budget. This project is included in the City of Port Angeles' FY 2024-2029 Capital Improvement Plan (CIP) Design and construct a decant facility to handle street sweepings, stormwater catch basin debris, wastewater soils, and water soils. This facility helps to prevent pollutants such as suspended sediment, heavy metals, nutrients, and trash from entering Port Angeles Harbor and the Salish Sea. The larger facility footprint will enable the City to process an additional 2,500 cubic yards of decant material per year. Liquids from dewatering would then be discharged into the sanitary sewer for further treatment at the Wastewater Treatment Plant. Solids would be stockpiled and turned as needed for aeration and drying. Funding is available in the form of a grant from Department of Ecology (DOE) in the amount of $474,300 with a city match of 15% from the solid waste reserves in the amount $83,700. An additional $35,000 from solid waste reserves was allocated for the purchase of property in the 2021 budget. Only the stormwater portions of the facility are grant eligible, in order to fund design & construction of Water, Stormwater and Wastewater portions of the facility, the utilities are contributing funding under WT0419, DR0120 and WW0519. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Municipal

$769,600.00

Public - City

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
38
Bidding Soon
1,049
All Active Projects
430
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

To Be Determined, Port Angeles, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.