BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Vidalia, Georgia. Completed plans call for the renovation of a educational facility; and playground / park / athletic field.

The Vidalia City School System is requesting submittals from qualified construction management firms for the projects listed below. If your firm is experienced in similar type and size projects, you are requested to submit your qualifications for consideration and an opportunity to submit a fee proposal for construction management service for the project. - Vidalia High School and JR Trippe Middle Schools - Paving patch , repair and resurfacing - JD Dickerson Elementary - Playground upgrades - SD Meadows Elementary / Vidalia High School - Epoxy flooring repair/replacement - SD Meadows - Renovations / Modifications - Daycare Suite - approx. 3000sf The Vidalia City School System has contracted with SP Design Group Architects and Engineers, Inc. for architectural services. The Vidalia City School System intends to enter into a contract with the successful Construction Management firm for the Pre-Construction and Construction Phase services associated with the project in order to meet an aggressive construction schedule and to construct the project within a fixed budget. Interested firms should submit a written request for the specific submittal format and requirements to the address listed below: requests may be submitted via mail, e-mail or facsimile. The Construction Management services shall include a Pre-construction Design Phase and a Construction Phase. The CM will provide comprehensive administration and management of all aspects of the construction of the project and will work in concert with the A/E towards the successful completion of the project on schedule, at or less than budgeted costs, meeting or exceeding standards stipulated by the construction documents, and in adherence with standards required by local authorities and other agencies having jurisdiction. The CM, either through in-house staff or outside consultant/contractors, will serve as a construction manager/contractor and provide all construction services and activities necessary for the design, construction, and occupancy of the project. The services described in this Request are representative of the services required but do not constitute a comprehensive specification. A comprehensive specification of the Scope of Services required is contained in the proposed Construction Management Agreement that will be issued to all short-listed respondents. Supply financial and main banking references. List the firm's total annual billings for each of the past three calendar years. What percentage of your firm's work has been negotiated during the past three years Has the firm ever failed to complete, or been removed from any project that it has been awarded The CM selected will be required to provide a 100% performance and payment bond for the entire amount of the cost of construction; confirm your ability to meet this requirement and provide your firm's bonding rate for a project of this value. The Owner reserves the right to reject any or all Proposals received. The Owner is not obligated to request clarifications or additional information but may do so at its discretion. The Owner reserves the right to extend the deadline for submittals. Upon receipt of said proposals by the Owner, the proposal shall become the property of the Owner without compensation to the Respondent. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until the final award. The preliminary construction budget of the project is $1,000,000.`(One Million Dollars) Construction shall begin at the end of May 2024 with substantial completion reached NLT end of July 2024. The CM will be responsible for reviewing and incorporating milestones into his own Total Project Schedule.

Award

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
24
Bidding Soon
321
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Vidalia, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.