Site work and paving for a road / highway in New York, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Harlem Valley Rail Trail Resurfacing, Under Mountain Road to State Route 344, Taconic State Park, at Copake Falls, Columbia County, New York. This project mainly involves, but not limited to, selective removal of existing asphalt pavement and gravel subbase, removal of existing split rail fence, removal of existing bollards, furnish & installation of gravel subbase and asphalt pavement, furnish & installation of wire fence with wooden posts, furnish & installation of pedestrian traffic signs and fold down bollards, furnish & applying striping to existing parking lot and pedestrian crossings at various locations. Additionally, furnish, installation and continual monitoring of any/all erosion control devices as shown on the plans, with additional as necessary toward compliance with the Stormwater Pollution Prevention Plan (SWPPP) issued for the project. Lastly, restoration of all disturbed areas (topsoil, seeding and mulch). Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 8% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of: $90,000. The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. All Requests For Information (RFIs) are due by: 4:00 PM on Tuesday, January 09, 2024 RFI should be submitted by e-mail to: linyao.longacker@parks.ny.gov. The completion date for this project is 240 days after agreement has been approved by the NYS Comptroller's Office. Project Specific Liquidated Damages (Refer to Article 14.10 of the General Conditions). The Contractor agrees, in the event the Contractor fails to complete all the work on time, to pay the Office Liquidated Damages as per the General Conditions, Article 14.10, for each day of delay in the physical completion of the work. Engineer's Estimate Range ($1,530,000 - $2,070,000) OPRHP reserves the right to suspend, modify, or cancel this procurement at any time during the procurement process. OPRHP also reserves the right to waive or extend the deadlines in this procedure. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,515,867.00

Public - State/Provincial

Paving, Site Work

21

20

26

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,013
Active Projects
566
Bidding Soon
7,670
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2024

March 25, 2024

Project location map

Multiple Locations, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.