BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hereford, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Cochise County, AZ Type of Construction: Highway FAR Magnitude: $250K - $500K NAICS: 237990 SIZE STD: $45M SET-ASIDE: Total Small Business Bureau of Land Management Contact Contracting Officer (CO) Name: Greetchen Jeremie Email: gjeremie@blm.gov Questions Due Date: 13 June 2024 / 2PM Mountain Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK 103.02 The project includes, but not limited to, the following work. Summary: This project includes trail improvements of approximately 2.5 miles of the Fairbank Trail Way at a proscribe width and a Town Site loop with proscribe widths as well (see segment table). The non-motorized recreational trail is used for hiking, equestrians, and mountain biking. The material to be used for all proposed maintenance and improvements will be 1/4 minus decomposed granite and achieve 95% compaction with proper slopes to ensure drainage is adequate. Water may be provided from multiple water hydrants located throughout Town Site at the permission and ownership of BLM. Description of Work: Furnish all transportation, labor, equipment, materials, supplies and traffic control. Prepare the subgrade and install aggregate resurfacing of existing trail system as described in the specifications and shown on the Maps and Drawings. Work will include but not limited to the installation of proposed aggregate in 3-inch lifts until the proposed 6-inch total resurfacing is achieved. Standard size and conventional equipment may not be suitable since the dense vegetation growth throughout the trail may require the use of compact earth moving equipment instead. Fairbank Trail ADA Maintenance KMZ file: It is recommended that potential solicitors to this project request the KMZ file that pacifically outlines work to be done. To open the KMZ file the solicitor will need to have Google Earth pro software to be able to view the map and use all its functions to better understand the entire scope of work. Only upon request the Contracting Officer (CO) or Contracting Officer Representative (COR) shall provide the KMZ file.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
6
Bidding Soon
300
All Active Projects
91
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 8, 2024

August 1, 2024

img_map_placeholder

4070 S Avenida Saracino, Hereford, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.